Laserfiche WebLink
Permit Modified: Wober 16, 2014 Elk River WWTF Page 20 <br />Permit Expires: June 30, 2018 - Permit #: MN0020788 <br />Chapter & Domestic Wastewater --Pretreatment <br />S. Reporting and Notification <br />5.1 This permit may be modified in accordance with Minnesota Rules, ch. 7001 to require development of a <br />pretreatment program approvable cinder the Federal General Pretreatment Regulation (40 GFR 403). <br />5.2 If a SILT discharges to the POTW during a given calendar year, the Permittee shall submit a Pretreatment Annual <br />Report for that calendar year, due by January 31 of the following year. The Pretreatment Annual Report shall be <br />submitted on forms provided by the agency or shall provide equivalent information. <br />The Permittee shall submit the pre-treatment report to the following address: <br />MPCA <br />Attn: WQ Submittals Center <br />520 Lafayette Road North <br />St. Paul, Minnesota 55155-4194 (Minn..R. 7049.0720) <br />5.3 The Permittee shall notify the MPCA in writing of any: <br />a. SID of the Permittee's POTW which has not been previously disclosed to the MPGA,.; <br />b. anticipated or actual changes in the volume or quality of discharge by an industrial user that could result in <br />the industrial user becoming an SlU as defined in this chapter; or <br />c. anticipated or actual changes in the volume or quality of discharges by a SIU that would require changes to <br />the ,SIU's required local limits. <br />This notification shall be submitted within 30 days of identifying the IIJ as a SIU. Where changes are proposed, <br />they must be submitted prior to changes being made. (Minn. R. 7449.0700, Subp. 1) <br />5.4 Upon notifying the MPGA of a SItJ or change in a SIU discharge as required above, the Permittee shall submit <br />the following information on forms provided by the agency or in a comparable format: <br />a. the identity of the SIU and a description of the SIU's operation and process; <br />b. a characterization of the SAT's discharge; <br />c. the required local limits that will be imposed on the SIU; <br />d. a technical justification of the required local limits; and <br />e. a plan for monitoring the SIU which is consistent with monitoring requirements in this chapter. (Minn. R. <br />7049.0704) <br />5,5 In addition, the Permittee shall, upon request, submit the following to the MPGA for approval: <br />a. additional information on the SIU, its processes and discharge; <br />b. a copy of the individual control mechanism used to control the SIU; <br />c. the Permittee's legal authority to be used for regulating the SIU; and <br />d. the Permittee's procedures for enforcing the requirements imposed on the SIU. (Minn. R. 7049.0700, Subp. 3) <br />