My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 03-20-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
03-20-2017
>
4.4. SR 03-20-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 4:32:44 PM
Creation date
3/16/2017 4:00:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />1. <br />Introduction........................................................................................................................... 1 <br />A, Background...................................................................................................................1 <br />B, Purpose.........................................................................................................................1 <br />C- Report Organization.....................................................................................................2 <br />2. <br />Experimental Set-Up.............................................................................................................. 3 <br />A. Pilot Study Equipment.................................................................................................. 3 <br />B. Pilot Study Procedure and Schedule............................................................................ 7 <br />3. <br />Results and Discussion........................................................................................................... 8 <br />A. Biological Treatment Performance of WWTF.............................................................. 8 <br />B. Effects on the Disinfection System............................................................................... 9 <br />C� WWTF Effluent Flow................................................................................................... <br />12 <br />D. Bench -Scale Chlorination Test Results....................................................................... <br />13 <br />E, Impact on the Biosolids.............................................................................................. <br />15 <br />F. Notes and Visual Observations.................................................................................. <br />16 <br />G. WWTF Capacity Evaluation........................................................................................ <br />16 <br />The following Table 3.3 shows the available, and remaining capacity at the City's WWTF <br />if <br />the City accepts the leachate from Waste Management.................................................... <br />16 <br />4. <br />Conclusion...........................................................................................................................17 <br />A. Summary of Results.................................................................................................... <br />17 <br />B. Recommendations..................................................................................................... <br />17 <br />Figures <br />Figure 2.1: 21,000 gallons leachate storage tanks........................................................................... 3 <br />Figure2.2: Primary Hose Pump....................................................................................................... 4 <br />Figure 2.3: Sump Pump Located in 21,000 -gallon Storage Tank .................................................... 5 <br />Figure 2.4: DR 5000 Spectrophotometer......................................................................................... 6 <br />Figure 3.1: WWTF Effluent Results................................................................................................ 9 <br />Figure 3.2: Long -Term Pilot Study Results................................................................................... 10 <br />Figure 3.3: Elk River WWTF Flow............................................................................................... 13 <br />Figure 3.4: Comparison of Color between Chlorine Doses........................................................... 15 <br />Tables <br />Table 3.1: Leachate Percentage of Total Flow............................................................................... 13 <br />Table 3.2: Bench -Scale Effluent Chlorination Testing Results....................................................... 14 <br />Appendix <br />Appendix A: Raw Data <br />Appendix B: Notes and Observation <br />Prepared by: Bolton & Menk, Inc. Table of Contents <br />Waste Management/Elk River Leachate Pilot Study I T21.109643 <br />
The URL can be used to link to this page
Your browser does not support the video tag.