My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 ERMUSR 03-13-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
03-13-2017
>
5.4 ERMUSR 03-13-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 1:58:14 PM
Creation date
3/10/2017 1:57:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
four out of seven of our 69kV/20.47kV substation transformers are Waukesha transformers. The <br /> similarity in equipment of our substations is a value and safety adder. <br /> Also included in all of the quotes was the option to have a short circuit test conducted. The GRE <br /> engineers have recommend that we not conduct the test as the costs greatly exceed the value. <br /> ACTION REQUESTED: <br /> Staff recommends the Commission award the bid for the 69kV substation transformer per the bid <br /> package specifications to MC Sales for the Waukesha transformer with a 22-26 week delivery <br /> window for the amount$543,883. <br /> ATTACHMENTS: <br /> • 69kV Substation Transformer Bid Tabulation <br /> • Bid and Specification Analysis and Recommendation Letter <br /> 1 / <br /> Page 2 of 2 [POVEREI <br /> NATURE <br /> Reliable Ptblic� <br /> Power Provider POWERED T O S ERV E <br /> 108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.