My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 03-13-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
03-13-2017
>
4.1 ERMUSR 03-13-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 12:29:08 PM
Creation date
3/10/2017 12:29:08 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/13/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON ALL OF THE FOLLOWING LOAD CONTROL <br /> PROGRAMS; WITH THE EXCEPTION OF THE ELECTRIC VEHICLE CHARGING PROGRAM. <br /> domestic hot water needs from electricity consumed only during eight off-peak hours daily. Off- <br /> peak hours typically occur between 11 PM and 7 AM. Qualifying ETS configurations may be a <br /> large single tank, dual tanks plumbed in series, or an electric and non-electric tank plumbed in <br /> series with the electric placed on the cold water side. Electric water heater must have an energy <br /> factor of.91 or more and a minimum of 80 gallons of storage capacity. <br /> To qualify for the special rate, the customer shall provide: <br /> 1. An ETS water heating system which can be interrupted directly by a single 30 amp rated <br /> relay. <br /> 2. Obtain a load control device from ERMU. <br /> 3. Accommodations for a meter and load control device and associated wiring installed <br /> according to the applicable electrical codes, and installed by a qualified electrician. <br /> 4. Inspection by a State certified electrical inspector and a representative of ERMU. <br /> 5. This rate is not available for hot water use in any production process for Commercial and <br /> Industrial users. <br /> Elk River Municipal Utilities shall provide: <br /> 1. All electric energy consumed by the ETS water heater at $.045858 per kWh. <br /> 2. The rate is subject to application of the Power Cost Adjustment (PCA). <br /> 3. This equipment will be energized only for 8 off-peak hours daily. <br /> 4. A meter to measure electricity consumed by the ETS water heater. <br /> 5. A load control device and meter socket to accommodate the off-peak meter. <br /> Cycled Air Conditioning: This Program is available to all customers served by ERMU who <br /> have central air conditioners. Program participants must allow installation of a utility supplied <br /> load control device so air conditioning demand can be reduced at critical times. This Program is <br /> subject to the following terms and conditions: <br /> 1. The Customer must have a conventional central air conditioner, ASHP or GSHP, of at <br /> least 2 tons capable of being interrupted with a 5 amp relay. <br /> 2. ERMU will furnish the load control device and pay to have it installed by a licensed <br /> electrician. Separate metering is not required. <br /> 3. The Customer must allow access for installation of the load control device during normal <br /> business hours. <br /> 4. The Customer must allow access for load control maintenance and compliance <br /> inspections by ERMU personnel during normal business hours. <br /> 5. Customers must agree to allow ERMU or its designee to remotely cycle their central air <br /> conditioner, ASHP or GSHP, off for approximately 15 minutes out of each 30 minute <br /> period at critical peak use times during the cooling season (May through September). <br /> Except for extreme emergencies, duration of said control will not exceed 6 hours per day <br /> and more than 200 hours total per cooling season. <br /> 6. Customers who elect to participate in this Program must remain on it for at least one <br /> cooling season or part of the load control installation costs may be assessed to the <br /> customer. <br /> 7. Customers with central air conditioners, ASHP or GSHP, that are grossly oversized for <br /> the conditioned space will not be allowed to participate. Such systems do not provide <br /> ERMU sufficient load reduction relief at critical peak use times. <br /> 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.