Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />o/e <br /> <br />February 12, 1999 <br /> <br />John Weicht & Associates <br />P.O. Box 368 <br />Elk River, MN 55330 <br /> <br />Re: Plaisted Companies New Building <br /> <br />Dear Mr. Weicht: <br /> <br />As per the review of the plans you submitted to me, my concerns that will need to be <br />addressed prior to submittal of the final plans are as follows: <br /> <br />1. <br /> <br />State plumbing code does not allow the floor drain in a commercial establishment <br />to be run to daylight and because of equipment being stored in this building, all <br />floor drains shall go to a flammable waste trap. <br /> <br />2. Mechanicals will be a concern since' we will be dealing with a combustible <br />product and because this product is a dry substance airborne combustibles will be <br />a concern as to how they will be eliminated, such as a bagger or exhausting, etc. <br /> <br />3. Heating will also be a concern because of the airborne product. <br /> <br />4. Even through this building will be there for a minimum of20 years, a unisex <br />bathroom should be installed because of employees working there for bagging the <br />product. <br /> <br />5. Provide information as to the storage of all products in this building. If this peat <br />will be stored outside or inside bagged or stockpiled. <br /> <br />6. A structural engineer will be required to sign off on this building. <br /> <br />7. A mechanical engineer will be required for all mechanics. <br />