My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 03-15-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
03/15/1999
>
6.2. SR 03-15-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:13 AM
Creation date
2/15/2005 3:23:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Memo to the City CouncillCU99-2 <br />March 15, 1999 <br />Page 3 <br /> <br />. <br /> <br />one of the neighbors close to the proposed building spoke and said that he has <br />no problem with the building. The Planning Commission was concerned <br />with the unresolved building code issues, the classification of "temporary" <br />building, and whether or not to allow the building to vary from the Elk River <br />Architectural Standards. The Commission approved of staffs recommended <br />conditions with the following addition: <br /> <br />· THAT THE BUILDING CONFORM TO THE ELK RIVER ARCHITECTURAL <br />STANDARDS. <br /> <br />Recommendation <br /> <br />Staff recommends that the Planning Commission recommend approval of a <br />conditional use permit amendment to allow a temporary storage building <br />with the following conditions: <br /> <br />1. THAT THE BUILDING CONFORM TO THE UNIFORM BUILDING CODE AND <br />THE RECOMMENDATIONS OF THE ELK RIVER BUILDING AND ZONING <br />DEPARTMENT. <br /> <br />2. THAT THE BUILDING BE ACCESSIBLE BY EMERGENCY VEHICLES AND <br />THE ACCESS BE CONSTRUCTED TO SPECIFICATIONS RECOMMENDED BY <br />THE CITY ENGINEER. <br /> <br />. 3. THAT THE BUILDING BE LIMITED TO THE PROCESSING AND STORAGE OF <br />SOILS AND VEHICLE STORAGE. <br /> <br />4. THAT THE BUILDING BE CONSIDERED TEMPORARY AND CAN BE <br />REMOVED FOR RECLAMATION OR ROAD CONSTRUCTION PURPOSES <br />ONCE THE MINERAL EXCAVATION HAS CEASED. <br /> <br />5. THAT THE BUILDING CONFORM TO THE ELK RIVER ARCHITECTURAL <br />STANDARDS. <br /> <br />. <br /> <br />\ \e lkriver\sys\shrdoc \p I anning\stevewen \pemmo \eu99- 2ce. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.