Laserfiche WebLink
City Council Minutes Page 5 <br /> February 21,2017 <br /> ----------------------------- <br /> 2. The CUP shall expire if the authorized use ceases for more than six <br /> months. Failure to obtain an annual license will be evidence of cessation <br /> of use. <br /> 3. The applicant must apply for and receive approval of all required permits <br /> before any construction may begin. <br /> 4. A mineral extraction license shall be obtained annually. <br /> 5. Setbacks of 50 feet from Baldwin Ave and PID#75-103-3100 shall be <br /> maintained. Setbacks of 30 feet from US Hwy 169 and PID#75-103-4201 <br /> shall be maintained. Setback of 30 feet from the north property line, unless <br /> mining collaboration agreement across property lines is confirmed. No <br /> mining activity shall be permitted within the setback area without staff <br /> approval. <br /> 6. The need of buffering and/or screening in light of surrounding land uses <br /> shall be evaluated at the time of annual license renewal and shall be <br /> installed when directed by the city to protect surrounding land uses. <br /> 7. The applicant shall be responsible for the cost and construction of <br /> necessary and reasonable road improvements related to the project, as <br /> deemed necessary by the City, Sherburne County or MnDot. The City <br /> reserves the right to require the applicant to pay for road maintenance of <br /> haul routes. <br /> 8. The applicant shall work with the city engineer to locate the berming <br /> along Baldwin Street NW. <br /> 9. Wash operations shall not be permitted unless a plan for protecting <br /> ground water and surrounding environment is approved by the city's <br /> environmental consultant. <br /> 10. Dust control is required for all roads and within the site in accordance <br /> with air pollution standards and to ensure dust does not create a public <br /> nuisance or otherwise adversely affecting adjacent properties. <br /> 11. All activities on the site shall be conducted in a manner that is consistent <br /> with operating permits issued by the city, county, state, federal and other <br /> agencies. A copy of any and all permits related to the operation of the site <br /> shall be submitted to the city for their reference. <br /> 12. Vehicles and equipment not in operable condition or materials not <br /> associated with the mineral extraction/excavation activity shall not be <br /> kept or stored at the site. <br /> 13. The site shall be mowed or maintained to control noxious weeds and other <br /> vegetation. Existing trees and ground cover shall be preserved to the <br /> maximum extent possible. <br /> 14. Fencing shall be installed during extraction operations to ensure the safety <br /> of the public and environment as determined by the city engineer and <br /> environmental staff. <br /> 15. Hours of operation shall be allowed to be six (6) days a week, 24 hours a <br /> day, Sundays and holidays excluded. <br /> 16. A reclamation plan that reflects the 63 acres operation shall be approved <br /> by the city and completed within six months of cease of operation. <br /> 17. A letter of credit or bond in the amount of$157,500 shall be provided to <br /> ensure reclamation is completed within six months of cease of operation. <br /> P 0 W I R I D 0 Y <br /> otm§A UREJ <br />