<br />. <br /> <br />Work Task Cost Estimate7$) <br />5.0 ConceDtual Eneineerine SUDDort <br />- 5.1 Data CollectionlBase Maps - 25,000 <br />- .... 5.2 Preliminary Geotechnical Investigations 20,000 <br />- 5.3 Coordinate Track Engineering with BNSF 1 (y.'000 <br />- 5.4 Conceotual Ene:ineering for Station Site Plans 50,000 <br />- 5.5 Other Infrastructure Revisions and Utilities 78.000 <br />- 5.6 Svstems Ene:ineering 50,000 <br />- 5.7 Maintenance Facility Layout Design 75,000 <br />- 5.8 Maintenance Facilitv Location 25,000 <br />- 5.9 Capital Cost Estimate 35,000 <br />Subtotal for Work Task 5.0 368 000 <br />6.0 BNSF Coordination SUDDort (1999-2000) 50.000 <br />7.0 Proiect Mana!!ement and NCDA, PMT and Exec. Comm. Meetines 200000 <br />Sub- Total $2,505,000 <br />Contim!encv (10%) $250,500 <br />TOTAL $2,755,500 <br /> <br />. <br /> <br />. <br /> <br />Work Program for Northstar Corridor MIS and EIS <br />For the Proposed Commuter Rail Service <br />February 25, 1999 <br /> <br />~- <br />~~.. <br /> <br />27 <br />Wark Program <br />