My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6. SR 03-06-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
03-06-2017
>
4.6. SR 03-06-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 1:37:53 PM
Creation date
3/2/2017 1:36:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/6/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10 <br />all applicable county, state, and federal rules and regulations. DNR regulations regarding <br />appropriations permits shall also be strictly followed. <br />(02) Wetlands. If the Developer proposes the filling of wetlands in connection with development <br />of the Subdivision, final plat approval is contingent upon, and the final plat shall not be recorded <br />until, receipt of necessary permits from appropriate regulatory agencies to fill wetlands as proposed <br />by the Developer and approval by the Technical Evaluation Panel of the proposed mitigation plan <br />for wetlands filling. If these permits are denied, or approval of the wetland permit and mitigation <br />plan is subject to conditions which significantly impact the Subdivision, the final plat for the <br />Subdivision shall be resubmitted to the City Council for consideration of changes required for the <br />wetland approvals. The City shall receive a copy of the monitoring report annually for three years. <br />(03) Erosion Control. Prior to initiating any work on the site, the erosion control plan, Plan B, <br />shall be implemented by the Developer and inspected and approved by the City or other regulating <br />authority. The City may impose additional erosion control requirements if they are deemed necessary <br />to protect the downstream waters of the state. All areas disturbed by the grading operations shall be <br />stabilized per the MPCA NPDES Stormwater Permit for Construction Activity and the City MS4 <br />permit. Seed shall be in accordance with the City’s current seeding specification which will include <br />temporary erosion control measures to provide ground cover as rapidly as possible. All seeded areas <br />shall be fertilized, mulched, and watered as necessary for seed retention and growth. The parties <br />recognize that time is of the essence in controlling erosion. If the Developer does not comply with <br />the MPCA NPDES Stormwater Permit for Construction Activity, the City MS4 permit, with the <br />erosion control plan and schedule, or supplementary instructions received from the City or other <br />regulating authority, the City may take such action as it deems appropriate to control erosion. The <br />City will endeavor to notify the Developer in advance of any proposed action, but failure of the City <br />to do so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer <br />does not reimburse the City for any cost the City incurred for such work within ten (10) days, the <br />City may draw down the letter of credit to pay any costs. No development, utility or street <br />construction will be allowed and no building permits will be issued unless the plat is in full <br />compliance with the approved erosion control plan. <br />(04) Grading. The Subdivision shall be graded in accordance with the approved grading <br />development and erosion control plan, Plan B. The plan shall conform to City specifications. <br />Within thirty (30) days after completion of the grading and before the City approves individual <br />building permits (except up to three model home permits on lots acceptable to the Building Official <br />per section 18), the Developer shall provide the City with an “as constructed” grading plan certified <br />by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, <br />have been constructed on public easements or land owned by the City. The “as constructed” plan <br />shall include field verified elevations of the following: (a) cross sections of storm water <br />treatment/infiltration basins; (b) location and elevations along all swales, wetlands, wetland <br />mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed <br />“conservation area” posts; and (c) lot corner elevations and house pads, and all other items listed in <br />the City Code. The City will withhold issuance of building permits until the approved certified <br />grading plan is on file with the City and all erosion control measures, including full vegetation of <br />entire site, are in place as determined by the City Engineer. The Developer certifies to the City that <br />all lots with house footings placed on fill have been monitored and constructed to meet or exceed <br />FHA/HUD 79G specifications. The soils observation and testing report, including referenced <br />development phases and lot descriptions, shall be submitted to the Building Official for review prior <br />to the issuance of building permits. <br />(05) Clean Up. The Developer shall clean dirt and debris from all streets that has resulted from <br />construction work by the Developer, home builders, subcontractors, their agents or assigns. Prior to
The URL can be used to link to this page
Your browser does not support the video tag.