My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 03-08-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
03/08/1999
>
4.4. SR 03-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:12 AM
Creation date
2/15/2005 2:46:59 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />u <br /> <br />Howard R, Green Company <br />CONSULTING ENGINEERS <br /> <br />CONSULTING ENGINEERS <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />February 22,199 ' <br />File: 800110J-0069 <br /> <br />CITY OF ELK RIVER-SHERBURNE COUNTY <br />CSAH 12/CSAH 13 FUNDING AGREEMENT <br /> <br />The City of Elk Rivei' and Sherburne (jounty agree to the following conditions <br />regarding the funding of CSAH 12 and CSAH 13: <br /> <br />1. <br /> <br />Sherburne County will place its CSAH 13 designation on the newly <br />constructed road north of CSAH 12 and turn back to the City of Elk <br />River the existing CSAH 13 alignment. The existing CSAH 13 is in <br />reasonably good shape, having been overlaid in the late 1980's, however, <br />the new road will be in substantially better shape and will have a much <br />longer life cycle prior to needing any significant maintenance. <br />Therefore, Sherburne County will reimburse the City of Elk River, the <br />equivalent cost of a 1-1/2 inch overlay on the turnback portion of old <br />CSAH 13. <br />The City of Elk River agrees that the construction of the realigned <br />portion of CSAH 13 north of CSAH 12, including any land acquisition <br />necessary, will be funded entirely by the City of Elk River with no <br />contribution from Sherburne County. <br />The City of Elk River will overlay CSAH 13 from the point of the new <br />construction to the intersection of Tyler Street. This is approximately <br />1-1/2 miles. This again would be at no cost to Sherburne County. <br />The City of Elk River will install a signal system at the intersection of <br />old CSAH 13/CSAH 12/Main Street at no cost to Sherburne County. <br />When a signal system is warranted at the intersection of CSAH 12, <br />realigned CSAH 13, and Tyler Street, Sherburne County will fund 75 <br />percent of the signal system and the City of Elk River will fund 25 <br />percent of the signal system. This funding scenario is based on the <br />jurisdiction of the legs entering the intersection. <br />The City of Elk River will pay its fair share for the reconstruction of <br />CSAH 12, estimated at $150,0000 after the increase in ISTEA funding <br />is split between Sherburne County and the City of Elk River. <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />o./prpj ./800 11 OJ.csahI2.13 <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 . 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br />
The URL can be used to link to this page
Your browser does not support the video tag.