My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 02-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
02-21-2017
>
9.1. SR 02-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 4:12:04 PM
Creation date
2/16/2017 4:09:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. It appears that a right-of-way vacation will be required as part of this application. Staff would be <br />supportive of vacating portions of the existing street that are no longer necessary. However, a <br />cul-de-sac will need to be installed at the proposed driveway access point to the property. <br />9. Stormwater management requirements are needed as listed in Ordinance Sec. 78-503. - <br />Stormwater and urban runoff control and Sec. 78-504. - Post construction stormwater <br />management. NPDES permit is needed for construction activity disturbing one acre or more <br />of soil. (Post Construction runoff cannot exceed the current rate and volume) <br />10. A MIDS water quality report and soil borings showing the ground water depth is needed. City <br />Stormwater Ordinance can be found here: http://www.elkrivermn.gov/Index.aspx?NID=1185 <br />11. This project would fall under City Ordinance DIVISION 12. - SHORELAND <br />MANAGEMENT, Sec. 30-1831. – FP flodplain overlay district, Sec. 30-1833. - WSR wild and <br />scenic river overlay district as well as Minnesota Rules 6105.0140. <br />12. We expect the applicant will need to work through relocation of storm sewer, sanitary sewer and <br />water systems as part of their project. The general locations are shown here: <br /> 13. There is a conflict with the water main located in the road ROW on Yale St. in front of the <br />former Saxon Properties. <br />Sincerely, <br /> Zack Carlton, AICP <br />Planning Manager <br />763.635.1035
The URL can be used to link to this page
Your browser does not support the video tag.