My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 02-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
02-21-2017
>
8.2. SR 02-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 9:24:31 AM
Creation date
2/16/2017 3:58:38 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RADIAL OR <br />\ TRAPEZOIDAL CHANNEL \ <br />STORM WATER <br />SHALL BE CONTAINED <br />� TO THE CHANNEL <br />CONCRETE MAT <br />CROSS SECTIONAL VIEW <br />EXISTING GROUND <br />CONSTRUCTION NOTES: <br />1. GRADE OUTFALL AREA SO THAT WATER WILL FLOW DOWN THE CENTER OF THE CHANNEL AND BE <br />CONTAINED TO THE CHANNEL. ALL SUBGRADE SURFACES PREPARED FOR PLACEMENT OF MATS <br />SHALL BE SMOOTH AND FREE OF ALL ROCKS, STICKS, ROOTS, OTHER PROTRUSIONS, OR DEBRIS <br />OF ANY KIND. THE PREPARED SURFACE SHALL PROVIDE A FIRM UNYIELDING FOUNDATION FOR <br />THE MATS WITH NO SHARP OR ABRUPT BREAKS IN THE GRADE. <br />2. APPLY SEED DIRECTLY TO THE PREPARED SOIL PRIOR TO CONCRETE MAT INSTALLATION. USE <br />SEED PER PROJECT SPECIFICATIONS. <br />3. PRIOR TO INSTALLING HEADWALL, ANCHOR TRENCH INITIAL LEADING EDGE OF MAT 18", FILL AND <br />COMPACT ANCHOR TRENCH. INSTALL HEADWALL OVER MAT. <br />4. INSTALL CONCRETE MAT ROLLS. AVAILABLE WIDTHS ARE 5.5', 8', 10', 12', & 16' AVAILABLE IN <br />CUSTOM LENGTHS. A CONCRETE SAW SHALL BE USED TO CUT THE MAT TO EXACT SIZE AND <br />SHAPE. <br />5. APPLICATIONS WHERE OUTFALLS FLOW INTO RETENTION PONDS, EXTEND CONCRETE MAT A <br />MINIMUM OF 3' BELOW LOW WATER ELEVATION. <br />REV: 2/2017 <br />STANDARD <br />PLATE <br />C4 of CONCRETE EROSION MAT N0. <br />�' �, OUTLET INSTALLATION DETAIL 2513 <br />River <br />PRIOR TO INSTALLING <br />HEADWALL, <br />USE CONCRETE SAW <br />ANCHOR TRENCH <br />INITIAL LEADING <br />TO CUT MAT TO EXACT <br />EDGE OF MAT 18", <br />FILL <br />AND <br />SHAPE AND SIZE <br />ZE010 <br />COMPACT ANCHOR <br />TRENCH. <br />INSTALL HEADWALL <br />OVER MAT <br />❑ ❑ ❑ <br />ED] 01 LD <br />El El El El❑ ❑ <br />El <br />El <br />El <br />::1 ❑ ❑ ❑ <br />❑ ❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ <br />❑ ❑ L- <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ <br />000000000000 <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ Ez ❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />MAXIMUM GRADE <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ PER MFG SPECIFICATIONS <br />❑ ❑ ❑ <br />❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ <br />::1 ❑ ❑ ❑ <br />❑ ❑ ❑ C 7 ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ ❑ ❑ ❑ ❑ ❑ <br />❑ <br />❑ <br />❑ <br />77nnnnnn177nn77nn77n <br />nnn <br />PLAN <br />CONCRETE MAT <br />CONSTRUCTION NOTES: <br />1. GRADE OUTFALL AREA SO THAT WATER WILL FLOW DOWN THE CENTER OF THE CHANNEL AND BE <br />CONTAINED TO THE CHANNEL. ALL SUBGRADE SURFACES PREPARED FOR PLACEMENT OF MATS <br />SHALL BE SMOOTH AND FREE OF ALL ROCKS, STICKS, ROOTS, OTHER PROTRUSIONS, OR DEBRIS <br />OF ANY KIND. THE PREPARED SURFACE SHALL PROVIDE A FIRM UNYIELDING FOUNDATION FOR <br />THE MATS WITH NO SHARP OR ABRUPT BREAKS IN THE GRADE. <br />2. APPLY SEED DIRECTLY TO THE PREPARED SOIL PRIOR TO CONCRETE MAT INSTALLATION. USE <br />SEED PER PROJECT SPECIFICATIONS. <br />3. PRIOR TO INSTALLING HEADWALL, ANCHOR TRENCH INITIAL LEADING EDGE OF MAT 18", FILL AND <br />COMPACT ANCHOR TRENCH. INSTALL HEADWALL OVER MAT. <br />4. INSTALL CONCRETE MAT ROLLS. AVAILABLE WIDTHS ARE 5.5', 8', 10', 12', & 16' AVAILABLE IN <br />CUSTOM LENGTHS. A CONCRETE SAW SHALL BE USED TO CUT THE MAT TO EXACT SIZE AND <br />SHAPE. <br />5. APPLICATIONS WHERE OUTFALLS FLOW INTO RETENTION PONDS, EXTEND CONCRETE MAT A <br />MINIMUM OF 3' BELOW LOW WATER ELEVATION. <br />REV: 2/2017 <br />STANDARD <br />PLATE <br />C4 of CONCRETE EROSION MAT N0. <br />�' �, OUTLET INSTALLATION DETAIL 2513 <br />River <br />
The URL can be used to link to this page
Your browser does not support the video tag.