Laserfiche WebLink
13. The site shall be mowed or maintained to control noxious weeds and other vegetation. Existing trees <br /> and ground cover shall be preserved to the maximum extent possible. <br /> 14. Fencing shall be installed during extraction operations to ensure the safety of the public and <br /> environment as determined by the city engineer and environmental staff. <br /> 15. Hours of operation shall be allowed to be six (6) days a week, 24 hours a day, Sundays and holidays <br /> excluded. <br /> 16. A reclamation plan that reflects the 61.3 acres operation shall be approved by the city and completed <br /> within six months of cease of operation. <br /> 17. A letter of credit or bond in the amount of$153,250 shall be provided to ensure reclamation is <br /> completed within six months of cease of operation. <br /> Background/Discussion <br /> Case Nos. ZC 17-02 and CU 17-02 <br /> The applicant is seeking a zone change to Mineral Excavation Overlay and a CUP for mineral excavation <br /> on approximately 61.3 acres along Baldwin Avenue near the northern limits of Elk River. Site operations <br /> will include stripping, extraction,processing, and recycling of concrete and asphalt reclamation. Materials <br /> suitable for reclamation will also be blended onsite with excavated aggregates. <br /> Zoning <br /> The property is currently zoned Commercial Reserve Transition (CRT) and the applicant is proposing to <br /> add the Mineral Excavation Overlay District to the site. The Mineral Excavation Overlay District <br /> designation allows for mining operations with approval of a CUP. Surrounding properties are used for <br /> mining and residential uses. Staff does not have any concerns with impacts to the surrounding area. <br /> Transportation/Access <br /> Access to the site will be via Baldwin Avenue,which borders the eastern side of the project area. This <br /> access point will be shared with the mining operation to the north. Most traffic will travel south along <br /> Baldwin and turn onto 225I Ave NW,which intersects Highway 169. All operation activities will meet <br /> road restriction rules. <br /> Hours of Operation <br /> The proposed hours of operation are 24 hours a day except for Sundays and holidays. The site will be <br /> subject to the State of Minnesota noise standards and will comply with the stricter night time standards <br /> during the period from 7 p.m. to 7 a.m. as defined by MN Rules Chapter 7030, Noise Pollution Control. <br /> Setbacks <br /> The setbacks to this project are 50 feet along Baldwin Ave. and the northern property line along Livonia <br /> Township. Also, the setback of 30 feet is required along the property line adjacent to US Hwy 169. <br /> Because mining is occurring on properties to the south,it is suggested that mining is permitted within the <br /> setback areas to avoid a windrow situation along the property lines in collaboration with mining <br /> operations to the south. Setback from the property line to the south will be 30 feet, unless mining <br /> collaboration agreement across property lines is confirmed. <br /> Environmental Review <br /> An Environmental review was completed for a gravel mine operation on November 7, 2016. <br /> N:APublic Bodies\Agenda Packets\02-21-2017\Final\7.1 sr CU 17-02 11ax Steininger CC Report.docx <br />