Laserfiche WebLink
Max Steininger, Inc.:  Elk River Sand and Gravel Mine    7 | Page  <br />Zone Change & Conditional Use Permit Application   December 2016  <br />5.1 Reclamation Standards  <br />  <br /> Schedule:  <br />  <br />Reclamation will occur upon completion of mining activity. Reclamation will be completed  <br />within one year of final extraction activity.   <br />  <br /> Slopes:  <br />  <br />Slopes will be reclaimed in accordance with the reclamation plan. Finished slopes will not  <br />exceed 3:1 (H:V).   <br />  <br />6.0 STANDARDS  <br />  <br />6.1 Boundary:  <br />  <br />Extraction operations shall be conducted within the confines of the boundaries indicated within this  <br />application.  <br />  <br />6.2 Setbacks:  <br />  <br />The Site will operate in compliance with setbacks established in the Mineral Excavation section of  <br />the City of Elk Rivers Code of Ordinances. Extraction operations shall not be conducted within five  <br />feet of the right‐of‐way of an existing public utility; 50 feet of the boundary of any zone where such  <br />extraction operations are not permitted, 30 feet of the boundary of an adjoining property which is  <br />not being used for extraction operations or within any required buffer zone or setback area on the  <br />applicants or any adjoining property. Setbacks are illustrated on Sheet C2, Mine Plan.   <br />  <br />6.3 Fencing:  <br />   <br />During extraction operations, access to any areas where collections of water are one and one‐half  <br />feet in depth or more, or where extraction slopes are steeper than one foot vertical to one and one‐ <br />half feet horizontal, and any other areas where obvious danger to the public exists shall be controlled  <br />by a four foot tall fence with support posts spaced every ten feet.   <br />  <br />6.4 Appearance and Screening:  <br />  <br />All equipment will be kept operational. Abandoned equipment and rubbish will be periodically  <br />removed from the Site. Reclamation will begin as soon as practicable after each mining phase is  <br />complete. The Site will be graded in accordance with the reclamation plan.  <br />  <br />A screening berm will be constructed, seeded, mulched and maintained along the boundaries of the  <br />Site. Maintenance of the wooded setback areas will minimize visual impacts. Screening berms may  <br />be removed as part of final reclamation.    <br />  <br />6.5 Noise:  <br />