Laserfiche WebLink
Finalize the project details in PDR <br />12/07/16 <br />12/07/16 <br />Finalize the ordering of parts <br />12/08/16 <br />02/01/17 <br />Finalize the project details in CDR <br />02/01/17 <br />03/10/17 <br />Begin construction of the table assembly <br />02/16/17 <br />03/19/17 <br />Begin testing electrical components <br />02/01/17 <br />02/12/17 <br />Begin testing data logger, LED Et timer <br />02/01/17 <br />02/12/17 <br />Begin testing protection methods <br />02/12/17 <br />02/26/07 <br />Begin testing full electric systems <br />02/26/17 <br />03/19/17 <br />Begin construction of the roof assembly <br />02/16/17 <br />03/19/17 <br />Begin concrete pour <br />03/01/17 <br />03/15/17 <br />Full installation and delivery of system <br />03/16/17 <br />03/30/17 <br />NATURE <br />