My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. ECCSR 02-15-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Energy City Commission
>
ECC Packets
>
2010-2019
>
2017
>
02-15-2017
>
5.3. ECCSR 02-15-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2017 8:15:18 AM
Creation date
2/14/2017 8:07:54 AM
Metadata
Fields
Template:
City Government
type
ECCSR
date
2/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Direction <br />In order to determine the proper components for the Electrical System, a load <br />profile analysis was conducted to determine the estimated usage for the <br />project in the park. <br />Using that information, a source profile analysis was also conducted to ensure <br />that power generation exceeded the load. <br />► A power budget was then created from that data to determine the <br />components for the entire electrical system. <br />! The following slides address the source and load profile analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.