My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1 HRSR 02-06-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2017
>
02-06-2017
>
9.1 HRSR 02-06-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2017 12:58:13 PM
Creation date
2/3/2017 12:41:25 PM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
North of Highway 10 <br />❖ Reconfigure roadway patterns through the Study area to <br />respect the Highway 10 future plan. <br />❖ Concentrate employment generating land uses (e.g. <br />office/medical) north of Highway 10 to bring daytime users <br />that support the core downtown commercial. <br />❖ Concentrate mixed uses in taller buildings at the <br />intersection of Main Street and 4`h Street to maximize views <br />of the Mississippi River. <br />❖ Manage storm water drainage through a greenway <br />concept that connects Lion's Park to maximize views of the <br />Mississippi River. <br />❖ Establish higher density residential around Lion's Park to <br />increase its value and desirability. <br />November 19, 2012 - Part II, page 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.