Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Elk River Action Plan - Public Improvements Work Group <br /> <br /> <br />Design to Rivcr is an asset 1) Identify areas that offer good view-sheds to the river from the 2/99 Costs to be <br />use River to the road and open space determined <br /> community and a) Talk to MDNR and other environmental organizations Lce <br /> access and use about rules and regulations in relationship to trimming and <br /> of river needs to dead brush removal on river <br /> mcrease. b) If possible trim tree-line and clear underbrush in identified <br /> River is a view-shed areas <br /> potential draw 2) Investigate the possibility of a simple black top or seal coated 3/99 Lee <br /> for visitors to walkway from the bridge to Angel avenue. <br /> the community a) Talk to City official about what happened with initial plan <br /> and fmancing. <br /> b) Talk to contractors about costs and scope of project. <br /> c) Identify private land ownership and determine owner <br /> interest in project. <br /> 3) Determine existence and location of artesian well 4/99 <br /> a) Invcstigate potential to create (simple)fountain at the well <br /> site <br /> b) Utilize fountain as a focal point to river. <br /> c) Utilize fountain for ice sculpture in winter months <br /> 4) Incorporate "Elk" theme one river access areas. 5/99 <br /> a) Identify local talent that could carve/create oversized elk <br /> sculptures along river. <br /> b) Determine cost <br /> c) Investigate funding options <br /> d) Potcntial project/event for Art Soup. <br /> 5) Create a flower garden as a focal point on the island 5/99 <br /> a) Determine feasibility with local and state govcrning bodies. <br /> b) Approach "Garden Club" about the project. <br /> c) Consider native planting garden <br /> d) Investigate funding options. <br /> 6) Future projects <br /> 7) Paddlewheel replica <br /> 8 Fer to Island/Otse o Park <br /> .~ <br />