Laserfiche WebLink
<br />5.0 <br /> <br />Engineering Support <br /> <br />. <br /> <br />The following work will be completed at a level of detail to support the preparation of the <br />EIS: <br /> <br />5.1 Prepare base maps. <br /> <br />5.2 Conduct preliminary geotechnical investigations. <br /> <br />5.3 Coordinate alignment drawings for new track with BNSF who will prepare <br />drawings, including right-of-way requirements. <br /> <br />5.4 Quantify and prepare conceptual solutions for utility impacts. <br /> <br />5.5 Develop conceptual solutions for required street reconstruction and <br />intersection improvements. <br /> <br />5.6 Complete conceptual systems engineering including vehicles, fare <br />collection, signal systems, and communication systems. <br /> <br />5.7 Determine location of maintenance facility. <br /> <br />5.8 <br /> <br />Develop conceptual layout of the storage yard and shop facility, including <br />vehicle storage, vehicle maintenance building, operations facility, and <br />ancillary systems and security facilities. <br /> <br />. <br /> <br />5.9 Prepare conceptual engineering for each commuter rail station, bus staging <br />areas, park and ride lots, and access roadways. <br /> <br />5.10 Prepare refined capital cost estimate. <br /> <br />. <br /> <br />Draft Work Program for Northstar Corridor MIS and EIS <br />For the Proposed Commuter Rail Service <br />January 29, 1999 <br /> <br />12 <br />Work Program <br />