My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 02-16-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
02/16/1999
>
4.4. SR 02-16-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:10 AM
Creation date
2/7/2005 5:17:53 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/16/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5.0 <br /> <br />Engineering Support <br /> <br />. <br /> <br />The following work will be completed at a level of detail to support the preparation of the <br />EIS: <br /> <br />5.1 Prepare base maps. <br /> <br />5.2 Conduct preliminary geotechnical investigations. <br /> <br />5.3 Coordinate alignment drawings for new track with BNSF who will prepare <br />drawings, including right-of-way requirements. <br /> <br />5.4 Quantify and prepare conceptual solutions for utility impacts. <br /> <br />5.5 Develop conceptual solutions for required street reconstruction and <br />intersection improvements. <br /> <br />5.6 Complete conceptual systems engineering including vehicles, fare <br />collection, signal systems, and communication systems. <br /> <br />5.7 Determine location of maintenance facility. <br /> <br />5.8 <br /> <br />Develop conceptual layout of the storage yard and shop facility, including <br />vehicle storage, vehicle maintenance building, operations facility, and <br />ancillary systems and security facilities. <br /> <br />. <br /> <br />5.9 Prepare conceptual engineering for each commuter rail station, bus staging <br />areas, park and ride lots, and access roadways. <br /> <br />5.10 Prepare refined capital cost estimate. <br /> <br />. <br /> <br />Draft Work Program for Northstar Corridor MIS and EIS <br />For the Proposed Commuter Rail Service <br />January 29, 1999 <br /> <br />12 <br />Work Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.