My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 02-08-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
02/08/1999
>
6.2. SR 02-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:10 AM
Creation date
2/7/2005 5:00:30 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />This bid is higher than our estimated cost originally proposed to the Council on 12-18- <br />98. At that time, a rough guess on the hardware was $27,000.00. This was made prior <br />to the vendors actually seeing the hardware specifications. <br /> <br />This increase was impossible to predict as it took each vendor weeks to review the <br />specification document which was 16 pages in length. A large portion of the hardware <br />costs includes licensing. Because we have no current network, we have to purchase <br />group and individual licenses for each workstation. This project actually requires total <br />Microsoft licenses costing $12,351.34. The original look at hardware did not include the <br />required 7 x 24 maintenance either. This cost of $4,140.00 along with the license costs <br />accounts for the difference between the rough cost estimate proposed to council on 12- <br />18 versus what the final totals come out to be. The software costs have not changed - <br />remaining at $125,500.00. This includes design, software, training, installation, <br />configuration and the first year's maintenance cost. <br /> <br />We have still not received a firm cost on record conversion. We are working with the <br />same vendor who will be doing the conversions in Apple Valley, Ramsey, Anoka County, . <br />Fridley, Blaine, Eagan and Burnsville. They are trying to determine what a fair fee is for <br />sharing the program costs between departments. I believe at this point that the total <br />conversion package will be less than $10,000.00 <br /> <br />The cost for the project thus far is: <br /> <br />Hardware: $47,126.29 (includes engineering, install and maintenance) <br />Software: $125,500.00 <br />Conversion: $10,000.00 <br />Mobile CDPD: $30,000.00 <br /> <br />Total cost: <br /> <br />$212,626.29 <br /> <br />Additional costs that are yet to occur will include the following: <br /> <br />CAT 5 certified network cable: <br />Network printers: <br />Two additional workstations: <br /> <br />$2,900 <br />$2,000 <br />$2,500 <br /> <br />We have two areas that we hope will reduce the total amount being requested: <br /> <br />Current money set-aside for mobile application: <br />Federal COPS grant: <br /> <br />$40,000.00 <br />$70,000.00 <br /> <br />If these were applied towards the overall cost the amount being requested would be <br />$102,626.29. (Not including the $7,400.00 for the cable and printers) <br /> <br />We are requesting final approval on the network installation, software purchase and <br />associated costs. We feel the total amount requested less the mobile amount would be <br />the wisest choice at this point. We are counting on the grant coming through but are <br />concerned that if it does not, that the project would fall through. The total amount <br />requested less the $40,000 is $180,026.29. (This includes printers and workstations) <br />
The URL can be used to link to this page
Your browser does not support the video tag.