My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RES 17-07
ElkRiver
>
City Government
>
City Council
>
Council Resolutions
>
2010 - 2019
>
2017
>
RES 01-24
>
RES 17-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 3:13:49 PM
Creation date
1/23/2017 3:49:14 PM
Metadata
Fields
Template:
City Government
type
RES
date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT B <br />CONDITIONS OF APPROVAL <br /> <br />1. The environmental review process (EAW) shall be completed. <br />2. Storm water management requirements are needed as listed in ordinance. <br />3. Sec. 78-503. – Stormwater and urban runoff control, and Sec. 78-504. – Post construction <br />stormwater management. NPDES permit is needed for construction activity disturbing <br />one aces or more of soil and all SWPPP details are required (previous NPDES permit can <br />be amended). <br />4. A MIDS water quality report and soil borings showing the ground water depth and <br />infiltration rate is needed. Three feet of separation between the bottom of any proposed <br />infiltration basin and groundwater is required. <br />5. Maintenance schedule for permanent stormwater BMPs is required. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.