Laserfiche WebLink
<br />EXHIBIT B <br />CONDITIONS OF APPROVAL <br /> <br />1. The environmental review process (EAW) shall be completed. <br />2. Storm water management requirements are needed as listed in ordinance. <br />3. Sec. 78-503. – Stormwater and urban runoff control, and Sec. 78-504. – Post construction <br />stormwater management. NPDES permit is needed for construction activity disturbing <br />one aces or more of soil and all SWPPP details are required (previous NPDES permit can <br />be amended). <br />4. A MIDS water quality report and soil borings showing the ground water depth and <br />infiltration rate is needed. Three feet of separation between the bottom of any proposed <br />infiltration basin and groundwater is required. <br />5. Maintenance schedule for permanent stormwater BMPs is required. <br /> <br />