My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 PCSR 01-24-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2017
>
01-24-2017
>
5.3 PCSR 01-24-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:30:40 PM
Creation date
1/20/2017 3:28:41 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/24/2017
case
CU 17-02 ZC 17-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13. The site shall be mowed or maintained to control noxious weeds and other vegetation. Existing <br />trees and ground cover shall be preserved to the maximum extent possible. <br />14. Fencing shall be installed during extraction operations to ensure the safety of the public and <br />environment as determined by the city engineer and environmental staff. <br />15. Hours of operation shall be allowed to be six (6) days a week, 24 hours a day, Sundays and <br />holidays excluded. <br />16. A reclamation plan that reflects the 63 acres operation shall be approved by the city and <br />completed within six months of case of operation. <br />17. A letter of credit or bond in the amount of $157,500 shall be provided to ensure reclamation is <br />completed within six months of case of operation. <br />Background /Discussion <br />The applicant is seeking a Zone Change to Mineral Excavation Overlay and a Conditional Use Permit <br />(CUP) for Mineral Excavation on approximately 63 acres along Baldwin Avenue and near the northern <br />limits of Elk River. Site operations will include stripping, extraction, processing, and recycling of <br />concrete and asphalt reclamation. Materials suitable for reclamation will also be blended onsite with <br />excavated aggregates. <br />Zo� <br />The subject property is currently zoned Commercial Reserve Transition (CRT) and the applicant is <br />proposing to add the Mineral Excavation overlay district to the site. The Mineral Excavation district <br />allows for mining operations with approval of a CUP. Surrounding properties are used for mining and <br />residential uses. Staff does not have any concerns with impacts to the surrounding area. <br />Transportation /Access <br />Access to the site will be via Baldwin Avenue, which borders the eastern side of the project area. This <br />access point will be shared with the mining operation to the north. Most traffic will travel south along <br />Baldwin, and turn onto 225`h Ave NW, which intersects Highway 169. All operation activities will meet <br />road restriction rules. <br />Hours of Operation <br />The proposed hours of operation are 24 hours a day except for Sundays and holidays. The site will be <br />subject to the MN State noise standards and will comply with the stricter night time standards during the <br />period from 7:00 p.m. to 7:00 a.m. as defined by MN Rules Chapter 7030, Noise Pollution Control. <br />Setbacks <br />The setbacks as they apply to this project are 50 feet along Baldwin Ave and the first 540 feet from the <br />southern property line from the southwest corner adjacent to PID #75- 103 -3100. Also, the setback of 30 <br />feet is required along the property line adjacent to US Hwy 169 and the first 1,150 feet from the southern <br />property line from the southeast corner adjacent to PID #75- 103 -4201. Because mining is occurring on <br />properties to the north, it is suggested that mining permitted within the setback areas to avoid a windrow <br />situation along the property lines in collaboration with mining operations to the north. Setback from the <br />property line to the north will be 30 feet, unless mining collaboration agreement across property lines is <br />confirmed. <br />Environmental Review <br />An Environmental review was completed for a gravel mine operation on November 7, 2016. <br />N: \Departments \Community Development \Planning \Case Files \CUP \CU 17 -01 Tiller \4Planning Commission \CU 17 -01 Tiller PC Reportdocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.