13. The site shall be mowed or maintained to control noxious weeds and other vegetation. Existing <br />trees and ground cover shall be preserved to the maximum extent possible. <br />14. Fencing shall be installed during extraction operations to ensure the safety of the public and <br />environment as determined by the city engineer and environmental staff. <br />15. Hours of operation shall be allowed to be six (6) days a week, 24 hours a day, Sundays and <br />holidays excluded. <br />16. A reclamation plan that reflects the 61.3 acres operation shall be approved by the city and <br />completed within six months of case of operation. <br />17. A letter of credit or bond in the amount of $153,250 shall be provided to ensure reclamation is <br />completed within six months of case of operation. <br />Background /Discussion <br />The applicant is seeking a Zone Change to Mineral Excavation Overlay and a Conditional Use Permit <br />(CUP) for Mineral Excavation on approximately 61.3 acres along Baldwin Avenue and near the northern <br />limits of Elk River. Site operations will include stripping, extraction, processing, and recycling of <br />concrete and asphalt reclamation. Materials suitable for reclamation will also be blended onsite with <br />excavated aggregates. <br />Zo� <br />The subject property is currently zoned Commercial Reserve Transition (CRT) and the applicant is <br />proposing to add the Mineral Excavation overlay district to the site. The Mineral Excavation district <br />allows for mining operations with approval of a CUP. Surrounding properties are used for mining and <br />residential uses. Staff does not have any concerns with impacts to the surrounding area. <br />Transportation /Access <br />Access to the site will be via Baldwin Avenue, which borders the eastern side of the project area. This <br />access point will be shared with the mining operation to the north. Most traffic will travel south along <br />Baldwin, and turn onto 225`h Ave NW, which intersects Highway 169. All operation activities will meet <br />road restriction rules. <br />Hours of Operation <br />The proposed hours of operation are 24 hours a day except for Sundays and holidays. The site will be <br />subject to the MN State noise standards and will comply with the stricter night time standards during the <br />period from 7:00 p.m. to 7:00 a.m. as defined by MN Rules Chapter 7030, Noise Pollution Control. <br />Setbacks <br />The setbacks as they apply to this project are 50 feet along Baldwin Ave. and the northern property line <br />along Livonia Township. Also, the setback of 30 feet is required along the property line adjacent to US <br />Hwy 169. Because mining is occurring on properties to the south, it is suggested that mining is permitted <br />within the setback areas to avoid a windrow situation along the property lines in collaboration with <br />mining operations to the south. Setback from the property line to the south will be 30 feet, unless mining <br />collaboration agreement across property lines is confirmed. <br />Environmental Review <br />An Environmental review was completed for a gravel mine operation on November 7, 2016. <br />N: \Departments \Community Development \Planning \Case Files \CUP \CU 17 -02 Max Steinina r Inc \4 Planning Commission \CU 17 -02 Max <br />Steininger PC Report.docx <br />