My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. PCSR 02-08-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2005
>
02/08/2005
>
3.0. PCSR 02-08-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:09 AM
Creation date
2/4/2005 2:56:49 PM
Metadata
Fields
Template:
City Government
date
2/8/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Completed Transportation Projects <br />January 31,2005 <br /> <br />Page 2 <br /> <br />. <br /> <br />5. School Street Upgrades <br /> <br />Over the years the Gty has used Municipal State Aid dollars for the upgrade of School <br />Street, which is now ultimately a four lane roadway from 1H 169 to Proctor Avenue and <br />includes four signalized intersections along the route. <br /> <br />6. CSAH 1 Upgrade <br /> <br />The Gty was able to work with Sherburne County on the upgrade of CSAH 1 from 1H <br />10 to County Road 32 and get that roadway designed to a four lane urban standard, <br />anticipating residential growth in that portion of the Gty. The County had initially <br />planned to upgrade it to a two lane rural roadway. Through the Gty working with the <br />County, the design was changed to a four lane urban design including a detached <br />pathway. <br /> <br />. <br /> <br />. <br /> <br />S:\Engineer\0131 05 Completed projects.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.