My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFORMATION #1 01-19-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
01/19/1999
>
INFORMATION #1 01-19-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:08 AM
Creation date
2/2/2005 4:22:49 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/19/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />... <br /> <br />. <br /> <br />Introduction <br /> <br />This Comprehensive Facilities Plan is the product of input by parents, administrators, principals, <br />teachers. staH, community members. the school board. and consultants over several years. This <br />summary represents the consolidation of many separate plans and strategies into one integrated <br />document addressmg facility needs within the Elk River Area School District. The Comprehensive <br />Facilities Plan is a guide for facilities improvements and the addition of new buildings. It does not <br />directly address changes in the educational programs. curriculum, or organizational policies. <br /> <br />Purpose <br /> <br />The main purpose of the plan is to recommend short and lo"~-term physical improvements to existing <br />facilities and to anticipate where and when new facilities will be needed. This planning is driven by the <br />following needs: <br /> <br />· To coordinate.a// existing district facility plans <br />· To formalize the annual planning process, and <br />· To generate a long term financial plan for facilities. <br /> <br />. <br /> <br />. <br />The Comprehensive Facilities Plan is based on current facility conditions. educational philosophy, <br />district policies, and financial realities. It aims to provide schools in which learning, in safe and healthy <br />environments, for students, families and the community is the priority. The facilities planning horizon is <br />ten years and the fiscal plan includes projections for the next five years. The plan will be revised <br />annually to reflect the latest economic, political, and demographic conditions. <br /> <br />The Comprehensive Facilities Plan outlined in this summary provides ways to address key facility needs <br />in the district, including: <br /> <br />1. New construction to Drovide leamino SDaCe for growing enrollments without over-building. <br />Setween 1998 and 2005, we expect to add one new high school and two new elementary schools. <br />In addition the district must change grade configurations, at least temporarily; <br /> <br />2. Implement deferred maintenance projects to improve the quality of our existing facilities; <br /> <br />3. Increase routine maintenance funding to limit backlogs in the future and to reduce overall <br />maintenance costs in the long-term; <br /> <br />4. Upgrade all technolOGY sYStems focusing on infrastructure improvements and seek additional and <br />expanded funding to implement upgrades; <br /> <br />5. Address educational Droaram imDrovements through capital funding to enhance specific programs <br />consistent w1th annual district priorities; <br /> <br />6. Implement asset manaaement plans which consider total costs (or savings) resulting from the <br />replacement of properties which are not efficient. <br /> <br />. <br /> <br />A Plan for District 728 Buildings and Sites, September, 1998: Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.