My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. SR 01-19-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
01/19/1999
>
4.1. SR 01-19-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:08 AM
Creation date
2/2/2005 3:54:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/19/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br /> NORTHSTAR CORRIDOR MAJOR INVESTMENT STUDY <br /> COMMUTER RAIL SYSTEM - SERVICE CONCEPT B <br /> PRELIMINARY CAPITAL COST ESTIMATE (1999 DOLLARS) <br />SEGMENT B . NE MINNEAPOLIS TO FRIDLEY APPROX. I-ENGTH (MI): 6.0 <br /> UNIT COMMUTER RAIL POTENTIAL CAPACITY ADDITIONAL CAPITAL <br />COST ELEMENT UNIT COST BASIC ELEMENTS IMPROVEMENTS IMPROVEMENTS <br /> QUANTITY COST QUANTITY COST QUANTITY COST <br />STATION (FRIDLEY) <br />PLATFORM, SHELTER, LIGHTING, FURNISHINGS, ETC. EA 375,000 2 750,000 . . . . <br />TICKET VENDING MACHINE EA 115,000 2 230,000 . - - - <br />PUBLIC ADDRESS & VMS EA 105,000 2 210,000 . - . . <br />SITE DEVELOPMENT /INCIDENTALS EA 250,000 1 250,000 - . - - <br />SURFACE PARKING SPACE 2,500 200 500,000 - . . - <br />PROPERTY ACQUISITION ACRE 180,000 2 360,000 . - - . <br />SUBTOTAL 2,300,000 . - <br />TRACKWORK <br />TRACK: 136# RAIL/CONCRETE TIES (NEW/UPGRADE) MI 623,000 - . . - . . <br />TURNOUT: #20 (NEW/UPGRADE) EA 170,000 - - - - - . <br />TURNOUT: #24 (NEW/UPGRADE) EA 185,000 - - . - - . <br />CROSSOVER: #20 (NEW/UPGRADE) EA 345,000 - - . - - - <br />CROSSOVER: #24 (NEW/UPGRADE) EA 378,000 - - - - - - <br />CROSSING SURFACE (NEW/UPGRADE) FT 675 - - - - - . <br />SUBTOTAL - - . <br />CIVIL / STRUCTURES <br />EARTHWORK / STRUCTURES LS 2,000,000 - - . - - - <br />MODIFY STRUCTURES LS 3,000,000 - - - . - - <br />SUBTOTAL . - . <br />SYSTEMS <br />SIGNALlNG/CTC (NEW/UPGRADE) MI 75,000 - - - - - - <br />CONTROL POINT: 1-SWITCH (NEW/UPGRADE) EA 563,000 - - - - - - <br />CONTROL POINT: 2-SWITCH (NEW/UPGRADE) EA 703,000 - - - - - - <br />CONTROL POINT: 4-SWITCH (NEW/UPGRADE) EA 849,000 - - - - - - <br />CROSSING SIGNALS (NEW/UPGRADE) EA 270,000 - - - - - - <br />SUBTOTAL - . - <br />RIGHT-OF-WAY SF 4.00 - - - - - . <br />CONSTRUCTION SUBTOTAL 2,300,000 - - <br />ADD-ONS <br />ENGINEERING, PROJ MGMT, ADMIN, START-UP, INSURANCE (20%) 460,000 - - <br />CONTINGENCY (20%) 460,000 - - <br />TOTAL (1999 DOLLARS) 3,220,000 - - <br /> <br />BRW, Inc. <br /> <br />[Q)~&[?IJ <br /> <br />Con-b-01.xls[SEGB] 12/04/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.