Laserfiche WebLink
<br />. <br /> <br />. At this time, no specific additional capital improvements have been identified for <br />service concept B. <br /> <br />. Based upon these preliminary results, the current estimated grand total for the <br />Northstar Corridor Commuter Rail system concept B, in 1999 dollars, is $144 to $164 <br />million between Minneapolis and East St. Cloud, with an additional $3.3 to $4.3 <br />million to the St. Cloud CBD or $5.1 to $7.1 million to Rice. <br /> <br />. Final capital cost estimates will be finalized after discussions with BNSF. <br /> <br />. <br /> <br />. <br /> <br />Draft Commuter Rail Technical Feasibility Study <br />December 1998 <br /> <br />5-3 <br />Capital Costs <br />