Laserfiche WebLink
Summary of Change Order No.5 -1.14.17 <br />You are directed to make the following changes in the Contract Documents: <br />Descriptions: <br />Unit <br />Qty UnitCost <br />Total <br />CB cover switch <br />LS <br />1 $ <br />292.91 <br />$292.91 <br />Remove Pavers and Bituminous <br />Areas <br />Sy <br />31 <br />$2.95 <br />$91.45 <br />Remove Curb <br />LF <br />27 <br />$7.50 <br />$202.50 <br />Salvage Light Pole <br />EA <br />-4 <br />$265.00 <br />-$1,060.00 <br />Concrete Curb <br />LF <br />32 <br />$31.00 <br />$992.00 <br />Concrete Curb Flat Curb <br />LF <br />4 <br />$31.00 <br />$124.00 <br />Concrete 6 Inch Reinforced -Stage <br />Misc, Walks <br />SF <br />158 <br />$14.20 <br />$2,243.60 <br />Bituminous Pavement and Patching <br />SF <br />2780 <br />$6.15 <br />$17,097.00 <br />Install Stone Bench <br />LF <br />73 <br />$60.00 <br />$4,380.00 <br />Reinstall Salvaged Split Rail <br />Fencing <br />LF <br />-55 <br />$13.50 <br />-$742.50 <br />Net Contract change for Change Order $23, 620,96 <br />page 2 of 2 <br />