My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e ERMUSR 01-10-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
01-10-2017
>
6.1e ERMUSR 01-10-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 11:57:31 AM
Creation date
1/10/2017 11:57:30 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tirmuttni MINNESOTA DEPARTMENT OF HEALTH <br /> SECTION OF DRINKING WATER PROTECTION <br /> DEPART NTOF N-ALTN Public Water Supply Inventory Report a <br /> S;Pete!e <br /> System Name: Elk River Survey Date: 12121/2016 <br /> PWSID: 1710004 Surveyor: Kim Larsen, P.E. 1 <br /> System Contact: Eric J.Volk PWS Type: Community <br /> ;Treatment Information <br /> TREATMENT PLANT#8 <br /> Type: Treatment Plant Source Water: Groundwater <br /> Status: Active Design Capacity: 1,000 Gallons per Minute <br /> Availability: Primary Emergency Capacity: <br /> Operating Rate: 1000 Gallons per Minute <br /> Treatment Objective Treatment Process Mechanism <br /> Disinfection Chlorine/Gas <br /> Fluoride(Z) Fluoridation/Hydrofluosilicic acid <br /> ;Storage Information <br /> Elevated 1,500,000 <br /> Type: Storage-Elevated Capacity: 1,500,000 Gallons <br /> Status: Active Availability: Primary <br /> Chlorination: <br /> Elevated 1000000 <br /> Type: Storage-Elevated Capacity: 1,000,000 Gallons <br /> Status: Active Availability: Primary <br /> Chlorination: r <br /> Elevated 1000000 <br /> Type: Storage-Elevated Capacity: 1,000,000 Gallons <br /> Status: Active Availability: Primary <br /> Chlorination: <br /> Elevated 500000 <br /> Type: Storage-Elevated Capacity: 500,000 Gallons <br /> Status:Active Availability: Primary <br /> Chlorination: <br /> 12/27/2016 Page 7 of 9 <br /> 158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.