My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5 ERMUSR 01-10-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
01-10-2017
>
2.5 ERMUSR 01-10-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 10:20:34 AM
Creation date
1/10/2017 10:20:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Troy Adams, P.E.—General Manager <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> January 10, 2017 2.5 <br /> SUBJECT: <br /> Notice to Connexus Energy of Electric Service Territory Area 3 & 4 Transfer Date <br /> BACKGROUND: <br /> In March 2015 Elk River Municipal Utilities and Connexus Energy executed mutually agreeable <br /> terms with a multiyear arrangement for the Connexus service territory within the City of Elk <br /> River corporate boundary to be transferred to ERMU. <br /> DISCUSSION: <br /> On December 21, 2016, formal notice was given to Connexus documenting intent for a transfer <br /> of Areas 3 &4 in late 2017. Although the agreement only requires five months written notice of <br /> intent to transfer,this was given early to allow for planning and scheduling of the reintegration <br /> work needed to facilitate the transfer. It is preferable to coordinate a September 2017 transfer <br /> date; however, the actual date will be chose through a collaborative process with Connexus <br /> energy. Potentially,the two areas may be transferred on two separate dates similar to how Area 1 <br /> was transferred in 2015. <br /> As indicated on the attached overview map, Areas 3 &4 are located on the west side of Elk <br /> River on either side of the Elk River. In these two areas there are approximately 400 customers <br /> which are primarily residential. The reintegration,plant, and pre-work costs were all budget line <br /> items in the 2017 ERMU budget approved on December 13, 2016. <br /> ATTACHMENTS: <br /> • Notice of Electric Service Territory Area 3 and 4 Transfer Date—December 21, 2016. <br /> • 2015 Connexus Energy Electric Service Territory Transfer Agreement Overview Map <br /> El <br /> [ 011E111 a <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider POWERED T o SERVE <br /> 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.