My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.4 ERMUSR 01-10-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
01-10-2017
>
2.4 ERMUSR 01-10-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 10:16:28 AM
Creation date
1/10/2017 10:16:25 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUM EFFECTIVE JUNE 1, 2014 <br /> If Customer fails to interrupt load down to the PDL for the specified length of time <br /> of the control period in any calendar month a $5.00/kW demand penalty will be <br /> added to the Customers bill. The demand penalty will be determined using the <br /> maximum uncontrolled kW demand, defined as the highest hourly interval above <br /> the PDL recorded during all control periods in the billing month. The Customer <br /> will not receive the monthly credit for that month or any succeeding months until <br /> performance has been demonstrated to the satisfaction of ERMU personnel. If <br /> Customer fails to perform more than two times in any calendar year, ERMU <br /> reserves the right to terminate the Agreement. <br /> Approved Adopted May 20, 2014 <br /> Effective January 1, 20176 <br /> 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.