My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9. SR 01-03-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
01-03-2017
>
4.9. SR 01-03-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2016 10:58:12 AM
Creation date
12/29/2016 10:39:05 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/3/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Describe any reasonably foreseeable future projects (for which a basis of expectation has <br />been laid) that may interact with environmental effects of the proposed project within the <br />geographic scales and timeframes identified above. <br />There are two new gravel mines proposed approximately 1 mile north of ERX Motor Park off <br />Baldwin Street NW. The following properties are proposed for mineral extraction: <br />• PID 75-103-1101 (44 acres) <br />• PID 75-782-0105 (17 acres) <br />• PID 75-103-1300 (55 acres) <br />• PID 75-103-1400 (69 acres) <br />e. Discuss the nature of the cumulative potential effects and summarize any other available <br />information relevant to determining whether there is potential for significant environmental <br />effects due to these cumulative effects. <br />Cumulative potential effects would generally be limited to minimal effects to all environmental <br />factors presented in this EAW. All projects are being coordinated by the City of Elk River and <br />undergoing the appropriate level of environmental review. <br />20. Other potential environmental effects: If the project may cause any additional environmental <br />effects not addressed by items 1 to 19, describe the effects here, discuss the how the <br />environment will be affected, and identify measures that will be taken to minimize and mitigate <br />these effects. <br />No additional environmental effects were identified. <br />ROU CERTIFICATION. (The Environmental Quality Board will only accept SIGNED Environmental <br />Assessment Worksheets for public notice in the EQB Monitor.) <br />I hereby certify that: <br />• The information contained in this document is accurate and complete to the best of my <br />knowledge. <br />• The EAW describes the complete project, there are no other projects, stages or components other <br />than those described in this document, which are related to the project as connected actions or <br />phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, respectively. <br />• Copies of this EAW are being sent to the entire EQB distribution list. <br />Signature y _ <br />Title I%U t'IlJnm�„ atl 7&- � A,,- L.;-, <br />Date � :7 — 04C)f` <br />Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.