Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />City Council Minutes <br />November 27, 2000 <br /> <br />Page 5 <br /> <br />6.2. <br /> <br />6.3. <br /> <br />MnDOT - City Signal Agreement For County Roads 12 and 13 <br /> <br />Terry Maurer reviewed the two Traffic Control Signal Agreements between the <br />State of Minnesota and the City of Elk River. He explained that the agreements <br />are for the new signal being installed at the intersection of Main Street and Zane <br />Avenue (CSAH 12/13). <br /> <br />COUNCILMEMBER FARBER MOVED TO ADOPT RESOLUTION 00-102, FOR TRAFFIC <br />CONTROL SIGNAL AGREEMENT NO. 80971M BETWEEN THE STATE OF MINNESOTA, <br />DEPARTMENT OF TRANSPORTATION AND THE CITY OF ELK RIVER TO PROVIDE <br />MAINTENANCE ELECTRICAL ENERGY FOR THE TRAFFIC CONTROL SIGNAL AT 181sT <br />AVENUE (CSAH 12) AND TWIN LAKES ROAD (CSAH 13). COUNCILMEMBER <br />THOMPSON SECONDED THE MOTION. THE MOTION CARRIED 5-0. <br /> <br />COUNCILMEMBER FARBER MOVED TO ADOPT RESOLUTION 00-103, FOR TRAFFIC <br />CONTROL SIGNAL AGREEMENT NO. 80972R BETWEEN THE STATE OF MINNESOTA, <br />DEPARTMENT OF TRANSPORTATION AND THE CITY OF ELK RIVER TO PROVIDE <br />MAINTENANCE OF THE TRAFFIC CONTROL SIGNAL AT 181 ST AVENUE (CSAH 12) AND <br />TWIN LAKES ROAD (CSAH 13). COUNCILMEMBER MOTIN SECONDED THE MOTION. <br />THE MOTION CARRIED 5-0. <br /> <br />175TH Avenue Proiect Upddte <br /> <br />City Engineer Terry Maurer distributed the minutes from the October 17, 2000, <br />informational meeting that was held with numerous property owners along 175th <br />Avenue. It was noted that the meeting was well attended, with all but four of the <br />fourteen property owners in attendance, and that the city engineer has since <br />had discussions with some of the property owners who could not be in <br />attendance at the meeting. Key points discussed at the meeting included timing <br />options for the improvement, what is included in the scope of the project, <br />necessary right-of-way to be obtained by the city for the project, and that a <br />future decision will be made by the City Council on possible assessments. Some of <br />the next steps in the process include staking the necessary right-of-way so the <br />property owners can visually see where the new right-of-way line will be and how <br />it will be different from what currently exists and then to have legal descriptions <br />and offer sheets sent to the property owners. <br /> <br />At this point, based on the status of the County Road 12 improvement project, it is <br />anticipated that the 175th project will begin in late summer 2001. <br /> <br />6.4. HighwaY 169/County Road 331nterchanae Update <br /> <br />City Engineer Terry Maurer updated the council on the Highway 1691County <br />Road 33 interchange planning process. He informed the council that several <br />variations of the interchange are still under discussion. <br />