Laserfiche WebLink
Elk River Municipal Utilities <br />Proposed 2017 Utilities Fee Schedule <br />Proposed Proposed <br />CĻĻ 5ĻƭĭƩźƦƷźƚƓ <br />2016 <br />2017Increase <br />ELECTRIC <br />New Residential Electric Connection - Developer - Lot with ERMU water service$ 475.00 $ 475.00 <br />New Residential Electric Connection - Developer - Lot without ERMU water service$ 575.00 $ 575.00 <br />New Residential Electric Connection - Builder$ 875.00 $ 875.00 <br />New Wire Footages over 200' (per foot)$ 4.00 $ 4.00 <br />New Service Frost Trenching (per foot)$ 5.00 $ 5.00 <br />New Commercial & Industrial Electric Connection50%50% <br />Service Upgrades or Additions for Existing Customers100%100% <br />Minimum Temporary Electric Service Fee - Existing Transformer$ 150.00 $ 150.00 <br />Minimum Temporary Electric Service Fee - Without Existing Transformer$ 500.00 $ 500.00 <br />Street Light - 30' Decorative Pole with 6' Arm and Fixture$ 1,850.00 $ 1,850.00 <br />Street Light - 23' Decorative Pole with Traditionaire Fixture$ 1,500.00 $ 1,500.00 <br />Security Light - Wood Pole with Fixture$ 975.00 $ 975.00 <br />Security Light - Existing Pole$ 125.00 $ 125.00 <br />Pole Attachment Fee (per pole)$ 6.50 $ 6.50 <br />WATER <br />Water Access Charge = Water Connection Charge + Water Availability Charge$ 3,425.00 $ 3,528.00 3.00% <br />Water Connection Charge (Per Plumbing Unit) - Builder$ 3,090.00 $ 3,183.00 3.00% <br />Water Availability Charge (Per Plumbing Unit) - Developer$ 335.00 $ 345.00 2.98% <br />Abandoned Water Service$ 2,500.00 $ 2,500.00 <br />Hydrant Water Sales - Rental (per week)$50.00$50.00 <br />Hydrant Water Sales - Units (per 1000 gallons)$ 4.00 $ 4.00 <br />Deposit for 5/8" Hydrant Meter$ 150.00 $ 150.00 <br />Deposit for 2 1/2" Hydrant Meter$ 1,000.00 $ 1,000.00 <br />Private Hydrant Maintenance Program Monthly Fee$ 5.00 $ 5.00 <br />ADMINISTRATIVE <br />Administrative Fee for Continued Submission of Checks After No-Check Notice Given$ 20.00$ 20.00 <br />Billable Cost of Materials Markup15%15% <br />Billable Labor Markup55%55% <br />Billable Vehicle / Equipment (per employee per hour)$ 30.00 $ 30.00 <br />Electric Service Disconnect/Trip Fee - Meter Technician $ 50.00 $ 50.00 <br />Electric Service Disconnect/Trip Fee - Line Crew$ 150.00 $ 150.00 <br />Energy Audit$ 50.00 $ 150.00 200% <br />Meter Tampering Fee$ 250.00 $ 250.00 <br />Meter Testing Fee$ 50.00 $ 50.00 <br />NSF Fee$ 30.00 $ 30.00 <br />Penalty Amount10%10% <br />Photocopies (per page)$0.25New <br />Red Tag Handling Fee$ 20.00 $ 20.00 <br />Water Shut-Off Fee$ 100.00 $ 100.00 <br />