Laserfiche WebLink
Background <br />■ Application to locate a 120' wireless <br />telecommunication pole in the right-of- <br />way (RO� <br />■ Moratorium was passed in March of <br />2016 <br />■ to study permitting structures with <br />in the ROW <br />■ MN law provides cities with <br />comprehensive authority to manage <br />their ROWS <br />