Laserfiche WebLink
Capital Improvement Plan 2017 thn, 2021 <br />City of Elk River, Minnesota <br />Project# PM -01 <br />Project Name Pavement Management Program <br />Description <br />'reventative maintenance on our streets includes sealcoating, crackfilling <br />Department hifinstructure Improvements <br />Contact Engineer <br />Type Improvement <br />Useful Life 25 years <br />Category Street & Utility Construction <br />improvement projects to replace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks will be completed <br />other year. <br />I street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street <br />These techniques may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are <br />ted, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements. <br />Expenditures <br />2017 2018 2019 2020 2021 Total <br />Construction <br />4,480,000 4,500,000 5,250,000 14,230,000 <br />Preliminary Design <br />100,000 100,000 200,000 <br />Preventative Maintenance <br />200,000 200,000 200,000 200,000 200,000 1,000,000 <br />Total 4,680,000 300,000 4,700,000 300,000 5,450,000 15,430,000 <br />Funding Sources <br />2017 <br />2018 2019 <br />2020 2021 <br />Total <br />Municipal State Aid <br />1,351,696 <br />358,729 1,365,904 <br />373,222 1,380,687 <br />4,830,238 <br />Pavement Management Fund <br />3,118,304 <br />3,184,096 <br />3,919,313 <br />10,281,713 <br />Storm Water <br />150,000 <br />150,000 <br />150,000 <br />450,000 <br />Total 4,680,000 356,729 4,700,000 373,222 5,450,000 15,561,951 <br />2017-2011 CAPITAL IMPROVEMENT PLAN Page 48 <br />