Laserfiche WebLink
Capital Improvement Plan <br />City of Elk River, Minnesota <br />Project # FS -01 <br />Project Name Fire Station #1 <br />Description <br />!017 - Master planning study on fire facilities (carryover from 2016) <br />Justification I <br />Fire Station #1 was constructed in 1972 and based on age <br />2017 thru 2021 <br />Department Fire Stations <br />Contact Fire Chief <br />Type Study <br />Useful Life Unassigned <br />Category Building Maintenance <br />costs. <br />pose of the study is to lay the foundation for fire station facilities, specifically fire station #1 which was built in 1972. The study will <br />short and long range planning options to explore facility construction options for existing and possibly future fire station locations. <br />generator is an old federal surplus that is in need of replacement. It does not have an automatic transfer switch requiring the firefighters or <br />'to manually convert the station over to venerator by hand. Parts are becomine obsolete to make repairs. <br />Expenditures 2017 2018 2019 2020 2021 Total <br />Planning/Design 40,000 40,000 <br />Total 40,000 40,000 <br />Funding Sources 2017 2018 2019 2020 2021 Total <br />Government Buildings Reserve 40,000 40,000 <br />Total 40,000 40,000 <br />20/7-1021 CAPITAL IMPROVEMENTPLAN Page 22 <br />