Laserfiche WebLink
Partial Pay Estimate No.: 6 FI <br />2015 STREET IMPROVEMENTS <br />CITY OF ELK RIVER <br />SAP 204135-001, 204-107-W7,204-114-003, 204116-002 <br />BMI PROJECT NO. N15.108340 <br />"4r)Rl M, N,! - vr;"' 7 nc-; nR--R �R> <br />-7 <br />ITEM <br />NO. <br />ITEM <br />UNIT <br />PRICE <br />AS BID <br />PREVIOUS ESTIMATE <br />COMPLETED TO DATE <br />ESTIMATED <br />QUANTITY <br />ESTIMATED ESTIMATED <br />AMOUNT QUANTITY <br />ESTIMATED ESTIMATED <br />AMOUNT QUANTITY <br />ESTIMATED <br />AMOUNT <br />1 <br />2021.501 MOBILIZATION <br />$149,206.38 <br />1 UM <br />$149,206.38 <br />1 LUMP SUM <br />$149,206.38 <br />1.00 LUMP SUM <br />$149,206.36 <br />2 <br />2101.511 CLEARING AND GRUBBING <br />$3,733.15 <br />1 UM <br />$3,733.15 <br />1 LUMP SUM <br />$3,733.15 <br />1.00 LUMP SUM <br />$3,733.15 <br />3 <br />2104.501 REMOVE CONCRETE CURB &GUTTER <br />$4.80 <br />880T <br />%LIQN <br />$4,224.00 <br />841 <br />LIN FT <br />$4,036.80 <br />841.00 <br />LIN FT <br />$4,036.80 <br />4 <br />2104.501 REMOVE SEWER PIPE STORM <br />$10.93 <br />764T <br />$8,350.52 <br />614 <br />LIN FT <br />$6,711.02 <br />614.00 <br />LIN FT <br />$6,711.02 <br />5 <br />2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT <br />$1.33 <br />5013T <br />$6,667.29 <br />4814 <br />SQ FT <br />$6,402.62 <br />4,999.00 <br />SO FT <br />$6,648.67 <br />6 <br />2104.505 REMOVE CONCRETE VALLEY GUTTER <br />$14.40 <br />40D <br />$576.00 <br />56.2 <br />SQ YD <br />$809.28 <br />56.20 <br />SQ YD <br />$809.28 <br />7 <br />2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />$5.07 <br />1628 <br />SQ YD <br />$8,253.96 <br />2737 <br />SQ YD <br />$13,876.59 <br />2,737.00 <br />SQ YD <br />$13,876.59 <br />8 <br />2104.505 REMOVE BITUMINOUS PAVEMENT <br />$6.24 <br />400 <br />SQ YD <br />$2,496.00 <br />0 <br />SQ YD <br />$0.00 <br />0.00 <br />SQ YD <br />$0.00 <br />9 <br />2105.501 COMMON EXCAVATION P <br />$17.60 <br />16416 <br />CU YD <br />$288,921.60 <br />16416 <br />CU YD <br />$288,921.60 <br />16,416.00 <br />CU YD <br />$288,921.60 <br />10 <br />2105.505 MUCK EXCAVATION L <br />$0.53 <br />12000 <br />CU YD <br />$6,360.00 <br />3290 <br />CU YD <br />$1,743.70 <br />3,290.00 <br />CU YD <br />$1,743.70 <br />11 <br />2105.507 SUBGRADE EXCAVATION E <br />$10.13 <br />710 <br />CU YD <br />$7,192.30 <br />7682 <br />CU YD <br />$77,818.66 <br />8,954.00 <br />CU YD <br />$90,704.02 <br />12 <br />2105.521 GRANULAR BORROW C <br />$0.53 <br />14200 <br />CU YD <br />$7,526.00 <br />0 <br />CU YD <br />$0.00 <br />0.00 <br />CU YD <br />$0.00 <br />13 <br />2105.522 SELECT GRANULAR BORROW CV <br />$0.53 <br />710 <br />CU YD <br />$376.30 <br />3290 <br />CU YD <br />$1,743.70 <br />3,290.00 <br />CU YD <br />$1,743.70 <br />14 <br />2105.535 PLACE SALVAGED AGGREGATE FROM STOCKPILE (CLASS 7) <br />$4.001 <br />7275 <br />CU YD <br />$29,100.00 <br />8856.6 <br />CU YD <br />$35,426.40 <br />8,846.50 <br />CU YD <br />$35,386.00 <br />15 <br />2105.607 POND EXCAVATION P <br />$10.40 <br />665 <br />CU YD <br />$6,916.00 <br />665 <br />CU YD <br />$6,916.00 <br />665.00 <br />CU YD <br />$6,916.00 <br />16 <br />2118.607 AGGREGATE SURFACING C CLASS 2 <br />$63.90 <br />925 <br />CU YD <br />$59,107.50 <br />971.5 <br />CU YD <br />$62,078.85 <br />971.501 <br />CU YD <br />$62,078.85 <br />17 <br />2211.501 AGGREGATE BASE CV CLASS 5 <br />$10.67 <br />15570 <br />TON <br />$166,131.90 <br />23142.28 <br />TON <br />$246,928.13 <br />23,324.631 <br />TON <br />$248,873.80 <br />18 <br />2215.501 BITUMINOUS PAVEMENT RECLAMATION IN-PLACE 8" DEPTH <br />$1.62 <br />48764 <br />SQ YD <br />$78,997.68 <br />61018.68 <br />SQ YD <br />$98,850.26 <br />61,018.68 <br />SQ YD <br />$98,850.26 <br />19 <br />2215.501 BITUMINOUS PAVEMENT RECLAMATION 8" DEPTH <br />$2.08 <br />32576 <br />SQ YD <br />$67,758.08 <br />32576 <br />SQ YD <br />$67,758.08 <br />32,576.00 <br />SQ YD <br />$67,758.08 <br />20 <br />2231.501 BITUMINOUS PATCHING MIXTURE <br />$0.01 <br />675 <br />TON <br />$6.75 <br />27.33 <br />TON <br />$0.27 <br />27.33 <br />TON <br />$0.27 <br />21 <br />2231.604 BITUMINOUS PATCH - SPECIAL(ROADWAY) <br />$42.35 <br />800 <br />SQ YD <br />$33,850.00 <br />1538 <br />SQ YD <br />$65,134.30 <br />2,232.00 <br />SQ YD <br />$94,525.20 <br />22 <br />2231.604 BITUMINOUS PATCH -SPECIAL(DRIVEWAY) <br />$29.28 <br />1938 <br />SQ YD <br />$56,744.64 <br />2496.7 <br />SQ YD <br />$73,103.38 <br />2,496.70 <br />SQ YD <br />$73,103.38 <br />23 <br />2232.501 MILL BITUMINOUS SURFACE 1.5" <br />$1.38 <br />4226 <br />SQ YD <br />$5,831.88 <br />10897 <br />SQ YD <br />$15,037.86 <br />10,897.00 <br />SQ YD <br />$15,037.86 <br />24 <br />2232.501 MILL BITUMINOUS SURFACE 3" <br />$1.11 <br />6563 <br />SQ YD <br />$7,284.93 <br />12852.86 <br />SQ YD <br />$14,266.67 <br />12,852.86 <br />SQ YD <br />$14,266.67 <br />25 <br />2232.501 MILL BITUMINOUS SURFACE APER 0" - 2" <br />$0.92 <br />11305 <br />SQ YD <br />$10,400.60 <br />8917 <br />SQ YD <br />$87203.64 <br />8,917.00 <br />SQ YD <br />$8,203.64 <br />26 <br />2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 2,C <br />$61.02 <br />19037 <br />TON <br />$1,161,637.74 <br />16254.37 <br />TON <br />$991,841.66 <br />16,270.11 <br />TON <br />$992,802.11 <br />27 <br />2360.501 TYPE SP 9.5 WEARING COURSE MIXTURE 4,E <br />$60.091 <br />3486 <br />TON <br />$209,473.74 <br />3788.22 <br />TON <br />$227,634.14 <br />3,788.22 <br />TON <br />$227,634.14 <br />28 <br />2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE 2,C <br />$54.65 <br />11648 <br />TON <br />$636,563.20 <br />12889.03 <br />TON <br />$704,385.49 <br />12,889.03 <br />TON <br />$704,385.49 <br />29 <br />2411.618 MODULAR BLOCK RETAINING WALL <br />$30.53 <br />525 <br />SQ FT <br />$16,028.25 <br />0 <br />SQ FT <br />$0.00 <br />0.00 <br />SQ FT <br />$0.00 <br />30 <br />2501.515 12" RC PIPE APRON <br />$602.64 <br />16 <br />EACH <br />$9,642.24 <br />16 <br />EACH <br />$9,642.24 <br />16.00 <br />EACH <br />$9,642.24 <br />31 <br />2501.515 15" RC PIPE APRON <br />$693.30 <br />6 <br />EACH <br />$4,159.80 <br />6 <br />EACH <br />$4,159.80 <br />6.00 <br />EACH <br />$4,159.80 <br />32 <br />2501.515 18" RC PIPE APRON <br />$735.96 <br />6 <br />EACH <br />$4,415.76 <br />6 <br />EACH <br />$4,415.76 <br />6.00 <br />EACH <br />$4,415.76 <br />33 <br />2501.601 DRAINAGE IMPROVEMENTS AND REPAIR PIPE CULVERT <br />$3,749.16 <br />1 LUMP SUM <br />$3,749.16 <br />1 LUMP SUM <br />$3,749.16 <br />1.00 LUMP SUM <br />$3,749.16 <br />34 <br />2501.602 TRASH GUARD FOR 12" PIPE ARPON <br />$351.98 <br />16 <br />EACH <br />$5,631.68 <br />18 <br />EACH <br />$6,335.64 <br />18.00 <br />EACH <br />$6,335.64 <br />35 <br />2501.602 TRASH GUARD FOR 15" PIPE ARPON <br />$405.31 <br />6 <br />EACH <br />$2,431.86 <br />6 <br />EACH <br />$2,431.86 <br />6.00 <br />EACH <br />$2,431.86 <br />36 <br />2501.602 TRASH GUARD FOR 18" PIPE ARPON <br />$474.64 <br />6 <br />EACH <br />$2,847.84 <br />6 <br />EACH <br />$2,847.84 <br />6.00 <br />EACH <br />$2,847Z4 <br />37 <br />2503.541 12" RC PIPE SEWER DESIGN 3006 CLASS V <br />$30.93 <br />532 <br />LIN FT <br />$16,454.76 <br />424 <br />LIN FT <br />$13,114.32 <br />424.00 <br />LIN FT <br />$13,114.32 <br />38 <br />2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V <br />$33.07 <br />229 <br />LIN FT <br />$7,573.03 <br />268 <br />LIN FT <br />$8,862.76 <br />268.00 <br />LIN FT <br />$8,862.76 <br />39 <br />40 <br />2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V <br />2504.602 ADJUST GATE VALVE AND BOX <br />$37.33 <br />$266.65 <br />300 <br />13 <br />LIN FT <br />EACH <br />$11,199.00 <br />$3,466.45 <br />272 <br />13 <br />LIN FT <br />EACH <br />$10,153.76 <br />$3,466.45 <br />272.00 <br />16.00 <br />LIN FT <br />EACH <br />$10,153.76 <br />$4,266.40 <br />