My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0. SR 10-23-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
10/23/2000 - SPECIAL/JOINT
>
5.0. SR 10-23-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:05 AM
Creation date
1/31/2005 3:13:39 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/23/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Mr. Pat Klaers <br />October 23, 2000 <br />Page Two <br /> <br />We have estimated approximately 38,000 square feet of sidewalk area as shown on the <br />attached exhibit. If this entire area were to be replaced with a concrete paver product on an <br />aggregate/sand base material, which is the lower priced alternative, the construction cost for <br />this entire area would be approximately $350,000. As a comparison, to use standard concrete <br />sidewalk over this area would be approximately $175,000. Both these estimates include <br />removing the existing sidewalk. The one difference is the cost estimate for regular concrete <br />sidewalk assumes that the existing sidewalk on Lowell Avenue between Main Street and TH 10 <br />would not be replaced. We have presented these numbers as construction costs and have not <br />added overhead, because with this type of project, the overhead is not necessarily a function of <br />the type of sidewalk chosen. Overhead for either of these would be approximately the same. <br />Of course, there are many other alternatives where a combination of concrete pavers and <br />regular sidewalk could be used. For example, if there was approximately 50% of each, adding <br />together 50% of each estimated construction cost would give the typical construction cost <br />range. <br /> <br />If you have any questions or would like further information regarding this issue, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br /> <br />T~ <br /> <br />TJM:tw <br />Enclosure <br /> <br />Ltr-10-23-00 Klaers.doc <br /> <br />Howard R. Green Company <br />CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.