My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.2. ERMUSR 12-13-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
12-13-2016
>
2.2. ERMUSR 12-13-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2016 3:41:08 PM
Creation date
12/9/2016 3:41:07 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
been very involved in helping us plan for the implementation and financial reporting of <br /> them. There was discussion. Daryl Thompson stated he would be willing to make a motion <br /> to keep the current auditors provided staff could find an area in the budget where they <br /> could cut an additional $1,750 besides the cost savings identified at this meeting. Staff was <br /> directed to report back to the Commission at the next meeting on where the cut was made. <br /> Daryl Thompson made a motion to approve retaining the current auditors (AEM) for <br /> the next five years provided an additional$1,750 in budget cuts are made for said <br /> timeframe. Al Nadeau seconded the motion. Motion carried 3-0. <br /> 5.0 NEW BUSINESS <br /> 5.1 2017 Budget: Rates and Review <br /> Troy Adams provided an overview of the 2017 budget. The preliminary projected need for <br /> ERMU electric revenue increase is between 2.5% and 2.8%which is based on a 2.5% <br /> increase in wholesale power costs. Staff anticipates seeing the approved GRE wholesale <br /> rates for 2017 prior to the December Commission meeting and will adjust the budget <br /> accordingly for consideration by the Utilities Commission. Troy shared that the retail rate <br /> classes will be designed incorporating the results of the cost of service study, feedback and <br /> direction from the Commission, and finalized wholesale power costs. There was discussion <br /> on the electric cost of service and rate design study. Staff requested Commission direction <br /> on the allocation of the proposed rate increase. After discussion of the different options,the <br /> Commission was in favor of an across the board increase for all retail rate classes. The <br /> ERMU rate classes will be included with the budget in December for Commission <br /> adoption. <br /> In order to maintain the financial health and to plan for the short and long term water <br /> capital project projections, the 2017 water budget reflects an overall 2% increase in <br /> revenue. Troy explained that the allocation of the increase will be collected through an <br /> increase in customer charge and 1St tier water use rates. The rate design will be presented <br /> with the budget in December. <br /> Theresa Slominski presented the 2017 summary of budgets. Troy shared that one thing the <br /> summary does not reflect is the $1.00 per kW temporary demand credit as that would be <br /> covered with a transfer from reserves. Troy stated that if the Commission chooses to offer <br /> the credit for 2017, staff will build that into the budget. The Commission supported doing <br /> so. Theresa walked through the highlighted changes in the electric and water revenue and <br /> expense budgets. <br /> Mark Fuchs presented the 2017 electric department capital budget and went over the <br /> highlighted changes. Notable items for the electric budget included: territory acquisition <br /> costs; a new substation, pre-construction site work for the field services facilities; and the <br /> Page 4 <br /> Special Meeting of the Elk River Municipal Utilities Commission <br /> November 15,2016 <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.