Laserfiche WebLink
2.5 Evans Street <br />rdth <br />The segment of Evans Street, between 193 Avenue and 197 Avenue, is a collector road <br />connects other city streets and provides access to several surrounding businesses. The pavement <br />is in overall fair condition but shows several transverse and longitudinal cracks and is in need of <br />additional strength. <br />A bituminous overlay is proposed to provide additional structural strength and extend the life of <br />the pavement. Edged milling will be performed along the concrete curb and gutter such that the <br />new overlay will match the existing curb elevations. On the north and south ends, where a center <br />median exists, the existing bituminous will be milled to a uniform depth to prepare the roadway <br />for the overlay. The existing road will be the same elevation, or slightly higher, than existing. All <br />non ADA compliant pedestrian curb ramps will also be replaced on this segment. <br />The total estimated project cost for Evans Street is $300,235. The limits of the project are <br />depicted below in Figure 6. <br />Figure 6 <br />Evans Street <br /> <br />City of Elk River, Minnesota 7 | Page <br />2017 Street and Utility Improvements <br />