Laserfiche WebLink
<br />8. <br />N:\Departments\Community Development\Planning\Case Files\CUP\CU 15-20 Elk River Machine\CU 15-20 <br />PUD Agreement - ERMC.docx <br /> <br />EXHIBIT C <br />Development Standards <br /> <br />1. In addition to the building and construction standards outlined in Sec. 30-938 the <br />following materials shall be permitted: <br />a. Temporary fabric covered structures. <br />i. Shall receive apply for and receive approval of a building permit. <br />ii. Meet all building code requirements in regards to wind and snow loads. <br />iii. Shall be of an industrial grade material. <br />1. Material manufacturer and specifications shall accompany the building <br />permit application. <br />iv. The color shall be consistent with the existing buildings on site. <br />v. Fabric structures shall be constructed for no longer than five (5) years. <br /> <br />2. Building setback and maximum height requirements shall be as follows. All other <br />dimensional regulations shall reflect those of the I-1 zoning district. <br />a. Setbacks <br />i. Front Yard Setback – 30 feet <br />ii. Side Yard Setback – 25 feet <br />iii. Rear Yard Setback – 20 feet <br />b. Maximum Building Height <br />i. 45 feet <br />