Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 15, 2016 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had eleven new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue the tear down of old infrastructure in the River Ranch development. <br /> • Continue installing a new feeder from the east side of HWY 169 by GRE to the east side <br /> of HWY 10 across Nature's Edge Business Center. This feeder will give us a feeder loop <br /> under HWY 10 that will be used for the Area 2 acquired from Connexus. <br /> • Finished making up River Park Third Addition. <br /> • Continue to replace stickers, locks, and add signage to the underground equipment in the <br /> newly acquired Connexus Area 2. While doing this, we'll make any necessary changes to <br /> the maps and repair any small issues we may encounter. <br /> • Replaced a street light pole that was hit at 212th Avenue and Lander Street. <br /> • Put in a new service for the sign at Big Tex Trailers. <br /> • Finished putting in the underground infrastructure and street lights on Quaday Avenue <br /> near P&F Machining in Otsego. <br /> • Replaced a secondary pedestal that was hit on Albany Street. <br /> • We interviewed four applicants for the Lineworker position on October 26. We extended <br /> an offer, which was accepted by Jake Koehler. His tentative start date is November 14. <br /> POWERED BY <br /> 1 El I <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider POWERED To S E E,E <br /> 1 AR <br />