My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.2 ERMUSR 11-15-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2016
>
11-15-2016 SPECIAL
>
2.2 ERMUSR 11-15-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 3:54:30 PM
Creation date
11/10/2016 3:54:29 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
therefore an annual reduction of approximately$3,500 is what would be needed. <br /> 5.2 2017 Budget: Water and Electric Expenses <br /> Theresa Slominski presented the first cut of the 2017 Water and Electric Expense Budget <br /> and noted that the expense budget will change as the complete 2017 budget is assembled <br /> and the finalized wholesale power costs are reflected. Wholesale power costs, as well as <br /> revenue and rate increases for 2017 will be presented in November. <br /> Water Department Expense Budget- The 2017 forecast for water expenses reflected a <br /> 7.83% increase over the current year budget. Eric Volk shared that he had decided to <br /> include a few notable expenses here instead of the Capital Budget. Theresa provided <br /> further explanation on the rationale behind including the notable expenses here versus the <br /> Capital Budget. Most notable were an increase in Maintenance of Wells where $100,000 <br /> was included for additional expenses, Maintenance of Water Mains for leak detection and <br /> repairs, and software licensing. <br /> Electric Department Expense Budget—The 2017 forecast for electric expenses reflected a <br /> 2.18% increase over the current year budget. The wholesale power costs which make up <br /> between 70-75% of the operating budget were not included as staff is still waiting for final <br /> numbers. Although early estimates have come in at a 1.88% increase in power cost, staff is <br /> anticipating closer to 2.5%. John Dietz had a few questions on the line items that had been <br /> noted. Staff responded. <br /> 5.3 2017 Utilities Fee Schedule <br /> Troy Adams presented the 2017 Fee Schedule to the Commission. There were just four <br /> adjustments to the schedule from 2016 to 2017. A fee for photocopies was also added to <br /> accommodate for data requests. Staff recommended the Commission approve the 2017 <br /> Utilities Fee Schedule for adoption into ordinance by the City Council. John Dietz had a <br /> few questions. Staff responded. <br /> Daryl Thompson made a motion to approve the 2016 Fee Schedule. Al Nadeau <br /> seconded the motion. Motion carried 3-0. <br /> 5.4 Commercial All Electric with Ground Source Heat Pump Tariff <br /> Tom Sagstetter shared that during the Area 2 service territory transfer, staff identified a <br /> commercial customer class that was not represented in ERMU's existing commercial tariffs <br /> and load management rates. In an effort to help accommodate the special circumstances <br /> for existing customers on this Connexus rate, staff has developed a new Commercial All <br /> Electric with Ground Source Heat Pump Tariff. The tariff was designed for customers that <br /> have made a commitment to operate their facility as efficiently as possible using only <br /> electric energy for all of their requirements. Tom went over the benefits to ERMU of <br /> Page 7 <br /> Regular Meeting of the Elk River Municipal Utilities Commission <br /> October 11,2016 <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.