My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 HRSR 11-07-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2016
>
11-07-2016
>
7.2 HRSR 11-07-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2016 12:00:19 PM
Creation date
11/4/2016 11:59:39 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
11/7/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warranties <br />Special conditions <br />Amount of contract <br />Change order procedures <br />Payment terms <br />Termination procedures <br />Loan documents: <br />CMHP will forward the Repayment Agreement to homeowners. Homeowners <br />will execute the repayment agreement in the presence of a Notary Public, and return the executed <br />document to CMHP, along with any required owners match funds. All documents must be <br />executed and returned to CMHP before a project can start. The Repayment Agreement will be <br />recorded with the Sherburne County. <br />Notice to Proceed: <br />After receipt of the executed Repayment Agreement, receipt of owners <br />match funds, and confirmation of construction contract execution, the project can start. Upon <br />contractor request, CMHP will issue a Notice to Proceed to the contractor and provide a copy to <br />the homeowner. The notice will allow the contractor ninety (90) days from the date of the Notice <br />to Proceed to complete the specified work. Ninety (90) days will be the allotted amount of time <br />except under the following conditions: <br />The work is weather dependent and weather conditions have not allowed for the <br />completion of the work <br />The Notice to Proceed is issued too late in the building season to allow weather <br />dependent work to be completed on time <br />The selected contractor is too heavily committed to perform the work within the <br />allotted time and informs the homeowner and CMHP of the situation. A work <br />schedule will be established that is acceptable to the homeowner, CMHP, and the <br />contractor <br />Unforeseen difficulties develop with the approved work and force a delay <br />Failure to Start/Complete Project: <br />Upon receipt of the Notice to Proceed, a contractor will <br />have 90 calendar days in which to complete the contracted work. Failure to begin work within <br />the first 60 days will be grounds to terminate the contract unless unforeseen weather issues affect <br />the start date. <br />not <br />The 90-day time period shall be exceeded except through the issuance of a change order and <br />by approval of the homeowner. In the absence of a change order, a contractor who violates the <br />time period shall be penalized 10% of the unpaid balance for each week that the contractor is in <br />violation. <br />Payment Procedures: <br />All contractors will agree to the payment schedule established by CMHP <br />and the HRA. Typically draws will scheduled to provide for one draw for materials and a second <br />draw upon completion. Draw requests approved by CMHP must be submitted to the HRA at <br />least one week before the first Monday of a month to be paid in such month. Approved payments <br />will be made by the HRA directly to the contractor and will be deemed advances of the Loan to <br />the Homeowner. Steps and conditions for contractor payment include: <br />7 <br />443114v4 MJM EL185-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.