My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 11-07-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
11-07-2016
>
7.1. SR 11-07-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2016 2:40:45 PM
Creation date
11/4/2016 10:18:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/7/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i <br /> City°f Memorandum <br /> Elk <br /> River <br /> To: Planning Department <br /> From: Brandon Wisner, Stormwater Coordinator <br /> Date: October 4,2016 <br /> Subject: Site Plan Review Meeting—October 3,2016 <br /> The department listed above has reviewed the application(s) listed below and has the following <br /> comments: <br /> 1. Case # SP 16-08, P 16-17 SCB Ventures (Serrano Bros. Catering CUP & Plat) <br /> 1. A Minimal Impact Design Standard (MIDS) report is required. <br /> 2. An issued NPDES permit is required before grading can start. <br /> 3. Maintenance schedule for permanent stormwater BMPs is required. <br /> 4. Soil borings indicating groundwater depth and infiltration rates for the proposed <br /> infiltration basin location is required. Three feet of separation between the bottom of <br /> any proposed infiltration stormwater basin and groundwater is required (unless <br /> previously completed). <br /> 5. Inlet protection needed along adjacent Business Center Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.