My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 11-07-2016
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2016
>
11-07-2016
>
10.1. SR 11-07-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2016 9:48:13 AM
Creation date
11/4/2016 9:45:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/7/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cap W QIIIIl[ rovernent Pian 2017 thru 2421 Department Public Safety Building <br /> City of Elk River, Minnesota Contact Building Maintenance Supv. <br /> Project 4 PS-03 Type Maintenance <br /> Useful Life Unassigned <br /> Project Name public Safety BuildingCategory Building Maintenance <br /> Description Total Project Cost: $1,219,000 <br /> Public safety building projects include: <br /> 2017-Carpet replacement in the remaining Police and Fire department <br /> 2017-Additional garage space(2018),with engineering starting in(2017) <br /> 2018-2nd floor buildout of the public safety building(2019),with engineering starting in(2018) <br /> 2020-Floor tile replacement <br /> Justification <br /> The Public Safety building was built in 2002 and the traffic volume from staff and visitors has started to wear on the carpet and tiles. <br /> Due to additional traffic and space needs the Police department is in need of additional garage space and to help with flow of traffic. <br /> The 2nd floor of the Police department is not built out and the department is starting to plan for the eventual buildout of the 2nd floor. <br /> Expenditures 2017 2018 2019 2020 2021 Total <br /> Planning/Design 20,000 20,000 40,000 <br /> Construction 500,000 500,000 1,000,000 <br /> Building Maintenance 20,000 25,000 45,000 <br /> Total 40,000 520,000 500,000 25,000 1,085,000 <br /> Funding Sources 2017 2018 2019 2020 2021 Total <br /> Government Buildings Reserve 40,000 520,000 500,000 25,000 1,085,000 <br /> Total 40,000 520,000 500,000 25,000 1,085,000 <br /> Budget Impact/Other <br /> 2017-2021 CAPITAL IMPROVEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.