Laserfiche WebLink
Change Order 4 OWNER City of Elk River <br /> LANDSCAPE ARCHITECT Hoisington Koegler Group inc, <br /> CONTRACTOR Sunrant Construction <br /> THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES:CONSULTATION' iTH AN ATTORNEY IS ENCOURAGED y'YfTH RESPECT TO ITS <br /> COMPLETION OR MODIFICATION. <br /> PROJECT: <br /> Elk River-Rivers Edge Park Expansion CHANGE ORDER NUMBER: 4 <br /> DATE: 10.4.16 <br /> PROJECT N0: HKGI 015-032 <br /> TO CONTRACTOR: CONTRACT DATE: 4.22.16 <br /> 5unram Construction <br /> 20010 75th Ave IN,Corcoran,MN 55340 <br /> The Contract is changed as follows: (see sheet 23 <br /> Not vatid until signed by the Owner,Landscape Architect and Contractor. <br /> The odg;na€(Contract Sum)was $ 301,854.00 <br /> Net change by previously authorized Change Orders $ 71,765.00 <br /> The(Contract Suri)prior to this Change Order was $ 373,619,00 <br /> The(Contract Sum) will be_CHANGED by the Change Order in he amount of L 4000.00 <br /> The new(Contract Sum) including this Change Order will be $ 377,619.00 <br /> Thfs Change Order DOES NOT EFFECT Contract Time <br /> The date of Substantial Compfetion as of the date of ibis Change Order therefore fs 10.30.16 <br /> LANDSCAPE ARCHITECT CONTRACTOR OWNER <br /> Hoisington Koegfer Group inc, sunram Construction City of Elk River <br /> 123 North 3rd Street,Suite 100 20010 75th Ave N,Corcoran,PIN 55340 13005 Orono Parkway.Elk River,MN 55330 <br /> Minneapolis,Minnesota 55401 <br /> Army Bower <br /> IAfirrnameJ n tpritr!narnei ff3nnt Mme; CAL-via i'• C' t� nri�a <br /> -41 9't' 10.4.9 6 <br /> (signature and da e) signature and date) (signature and date) <br /> page 1 of 2 <br /> Et <br />