My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 BASR 10-25-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
2010-2019
>
2016
>
10-25-2016
>
4.3 BASR 10-25-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 10:05:13 AM
Creation date
10/20/2016 12:30:25 PM
Metadata
Fields
Template:
City Government
type
BASR
date
10/25/2016
case
V 16-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT of THE ARMY <br />ST. PAUL DISTRICT, CORPS OF ENGINEERS <br />160 FIFTH STREET EAST, SUITE 700 <br />ST. PAUL, MN 56101-1678 <br />OCTWLYTO 14 2016 <br />ArMUM of <br />Operations Division <br />Regulatory Branch (2016-03457-LMG) <br />Mr. Chris Murray <br />19252 Ogden Street NW <br />Elk River, Minnesota 55330 <br />Dear Mr. Murray: <br />This letter concerns your request for Department of the Army authorization to discharge fill <br />material into 0.05 acre of wetlands for the purpose of constructing a farm road. The project site <br />is in Section 30, Township 33 North, Range 25 West, Sherburne County, Minnesota. <br />The discharge of dredged or fill material in waters of the United States, including wetlands, <br />for the construction or maintenance of farm roads, forest roads, or temporary roads for moving <br />mining equipment is exempt from the Clean Water Act regulation, provided that you comply with <br />the Best Management Practices (BMPs) outlined in the enclosure. If your project meets these <br />BMPs, a Department of the Army permit is not required to do this work. <br />This letter is valid only for the project referenced above. If any change in design, location, or <br />purpose is contemplated, contact this office to avoid doing work that may be in violation of <br />Federal law. Please note that this confirmation letter does not eliminate the need for state, <br />local, or other authorizations, such as those of the Department of Natural Resources or your <br />county. <br />The decision regarding this action is based on information found in the administrative <br />record, which documents the District's decision -making process, the basis for the decision, and <br />the final decision. <br />If you have any questions, contact LeeAnn Glomski in our 8t. Paul office at <br />(651) 290- 5324 or LeeAnn. M. Glomskl'@usace. army. mil. in any correspondence or inquiries, <br />please refer to the Regulatory number shown above. <br />SincerelyAte <br />, <br />4. <br />Kristen Hafer <br />Chief, Southwest Section <br />Enclosure <br />cc: <br />Kristin Mroz, city of Elk River <br />Lynda Peterson, BWSR <br />
The URL can be used to link to this page
Your browser does not support the video tag.