My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 PCSR 10-25-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
10-25-2016
>
4.1 PCSR 10-25-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 10:16:48 AM
Creation date
10/20/2016 9:09:33 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
10/25/2016
case
P 16-17 SP 16-08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PPIC ., <br /> Elk ..,.%,„ <br /> Memorandum <br /> River <br /> To: Planning Department <br /> From: Brandon Wisner,Stormwater Coordinator <br /> Date: October 4,2016 <br /> Subject: Site Plan Review Meeting—October 3,2016 <br /> The department listed above has reviewed the application(s) listed below and has the following <br /> comments: <br /> 1. Case# SP 16-08,P 16-17 SCB Ventures (Serrano Bros. Catering CUP& Plat) <br /> 1. A Minimal Impact Design Standard (MIDS) report is required. <br /> 2. An issued NPDES permit is required before grading can start. <br /> 3. Maintenance schedule for permanent stormwater BMPs is required. <br /> 4. Soil borings indicating groundwater depth and infiltration rates for the proposed <br /> infiltration basin location is required.Three feet of separation between the bottom of <br /> any proposed infiltration stormwater basin and groundwater is required (unless <br /> previously completed). <br /> 5. Inlet protection needed along adjacent Business Center Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.