Laserfiche WebLink
PPIC ., <br /> Elk ..,.%,„ <br /> Memorandum <br /> River <br /> To: Planning Department <br /> From: Brandon Wisner,Stormwater Coordinator <br /> Date: October 4,2016 <br /> Subject: Site Plan Review Meeting—October 3,2016 <br /> The department listed above has reviewed the application(s) listed below and has the following <br /> comments: <br /> 1. Case# SP 16-08,P 16-17 SCB Ventures (Serrano Bros. Catering CUP& Plat) <br /> 1. A Minimal Impact Design Standard (MIDS) report is required. <br /> 2. An issued NPDES permit is required before grading can start. <br /> 3. Maintenance schedule for permanent stormwater BMPs is required. <br /> 4. Soil borings indicating groundwater depth and infiltration rates for the proposed <br /> infiltration basin location is required.Three feet of separation between the bottom of <br /> any proposed infiltration stormwater basin and groundwater is required (unless <br /> previously completed). <br /> 5. Inlet protection needed along adjacent Business Center Drive. <br />